The main objective of conducting a transportation project evaluation.

Expert Solution & Answer
Check Mark

Explanation of Solution

The main objective of a transportation project evaluation is to furnish the appropriate information about the outcome of each alternative so that a selection can be made. The decision making by the person or group is based on the information relevant to the selection made. An essential input in the process is to know what information will be important in making a project selection. Different methods and approaches are used and applied for preparing a transportation project evaluation.

It also aims to report all the outcomes separately in a matrix format that provides decision maker with complete information about the project outcome. This information can be used in public forums for citizen input, and the decision process can be extended to include public participation.

Conclusion:

The main objective of a transportation project evaluation is to furnish the appropriate information about the outcome of each alternative so that a selection can be made.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Two W14x38 tension members are connected with a splice connection using plates attached atthe top and the bottom flanges. The design axial load Pu is 320 kips. The bolts are made of A325X, and thebolt diameter is ½ inch. (Slip-Critical connection)( LRFD units)( Previous Solution was incomplete/incorrect)
A tension member made of L4x4x1/2 is connected to gusset plate with welds. Using E70electrode and ½ inch weld size, design the balanced weld lengths.( Use AISC manual, LRFD units)(Previous solution was incorrect)
Two W14x38 tension members are connected with a splice connection using plates attached atthe top and the bottom flanges. The design axial load Pu is 320 kips. The bolts are made of A325X, and thebolt diameter is ½ inch. (Slip-Critical connection)( LRFD units)
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning