Question
Book Icon
Chapter 13, Problem 13.1P
To determine

Find the magnitude of the lateral earth forces Po per unit length of the wall and find the location z¯ of the resultant measured from the bottom of the wall.

Expert Solution & Answer
Check Mark

Answer to Problem 13.1P

The magnitude of the lateral force is 393.1kN/m_.

The location of the resultant measured from the bottom of the wall is 2.5m_.

Explanation of Solution

Given information:

The height (H) of the retaining wall is 7.5 m.

The soil friction angle ϕ is 31°.

The angle of wall friction δ is 0.

The unit weight γ of the sand is 19.2kN/m3.

The over-consolidation ratio (OCR) is 2.2.

Calculation:

Calculate the earth pressure coefficient (Ko) using the relation.

Ko=(1sinϕ)(OCR)sinϕ

Substitute 31° for ϕ and 2.2 for OCR.

Ko=(1sin31°)(2.2)sin31°=0.48496×1.5009=0.7279

Calculate the total force per unit length (Po) using the relation.

Po=12KoγH2

Substitute 0.7279 for Ko, 19.2kN/m3 for γ, and 7.5m for H.

Po=12×0.7279×19.2×(7.5)2=393.1kN/m

Thus, the magnitude of the lateral earth force per unit length (Po) is 393.1kN/m_.

Calculate the location of the resultant (z¯) using the relation.

z¯=H3

Substitute 7.5m for H.

z¯=7.53=2.5m

Thus, the location of the resultant (z¯) measured from the bottom of the wall is 2.5m_.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
P15.45 WP A stainless steel pipe (Figure P15.45) with an outside diameter of 2.375 in. and a wall thickness of 0.109 in. is subjected to a bending moment M = 50 lb ft and an internal pressure of 180 psi. Determine the absolute maximum shear stress on the outer surface of the pipe. M FIGURE P15.45 M
10.72 What power must the pump supply to the system to pump the oil from the lower reservoir to the upper reservoir at a rate of 0.3 m³/s? Sketch the HGL and the EGL for the system. p=940 kg/m³ v = 10-5 m²/s Elevation 100 m Elevation 112 m L= 150 m Oil Steel pipe D = 30 cm Problem 10.72
L / 83° 28° $75°E M 202° Q2: The scanning process was completed from point J to point N. The direction of the straight line was LM and the angles of deviation are shown in the figure below. Find the direction of the remaining sides? N
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Principles of Geotechnical Engineering (MindTap C...
Civil Engineering
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Cengage Learning
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781305081550
Author:Braja M. Das
Publisher:Cengage Learning
Text book image
Fundamentals of Geotechnical Engineering (MindTap...
Civil Engineering
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning