1.
Throughput time is the total time required for the completion of a process. For instance, the time required to manufacture machinery from the beginning till its end is the throughput time. The throughput time comprises process time, inspection time, move time, and queue time. Wait time is not a part of throughput time.
:
The throughput time.
2.
The manufacturing cycle refers to the amount of time in the manufacturing process that is spent on enriching or improving the product. Basically, it is the time taken by an organization in order to convert raw material into finished goods. Manufacturing cycle time includes material movement time, loading time, idle waiting time, machining and assembly time, inspection time, and so on.
:
The manufacturing cycle efficiency for the quarter.
3.
Throughput time is the elapsed time from the time of inception of the production process till the goods are dispatched to the customer. The throughput time is made up of four elements. It is the total of process time, inspection time, move time, and queue time.
:
The percentage of throughput time spent in non-value-added activities.
4.
Delivery cycle time is the total time required to produce as well as deliver the product to the customers. Basically, the elapsed time from the procurement of a client order until the final product is dispatched is the delivery cycle time.
:
The delivery cycle time.
5.
The manufacturing cycle refers to the amount of time in the manufacturing process that is spent on enriching or improving the product. Basically, it is the time taken by an organization in order to convert raw material into finished goods. Manufacturing cycle time includes material movement time, loading time, idle waiting time, machining and assembly time, inspection time, and so on.
:
The new MCE if by using Lean Production all queue time during production is eliminated.
Want to see the full answer?
Check out a sample textbook solutionChapter 12 Solutions
MANAGERIAL ACCT(LL)+CONNECT+PROCTORIO PL
- 13?arrow_forwardManagement of Mittel Company wants to reduce the elapsed time from when a customer places an order to when it is shipped. It provided the following data for a recent quarter: Inspection time Wait time (from order to start of production) Process time Move time Queue time Required: 1. Compute the throughput time. Note: Round your answer to 1 decimal place. 1. Throughput time 2. Manufacturing cycle efficiency 3. Non-value-added throughput time 4. Delivery cycle time 5. New manufacturing cycle efficiency 2. Compute the manufacturing cycle efficiency (MCE) for the quarter. Note: Round your percentage answer to nearest whole percent. 3. What percentage of the throughput time was spent in non-value-added activities? Note: Round your percentage answer to nearest whole percent. 4. Compute the delivery cycle time. Note: Round your intermediate calculations and final answer to 1 decimal place. 5. If using Lean Production eliminates all queue time, what will be the new MCE? Note: Do not round…arrow_forwardSaved Management of Mittel Company would like to reduce the amount of time between when a customer places an order and when the order is shipped. For the first quarter of operations during the current year the following data were reported: Inspection time Wait time (from order to start of production) 0.3 days 15.1 days 3.2 days 0.7 days 4.0 days Process time Move time Queue time Required: 1. Compute the throughput time. (Round your answer to 1 decimal place.) 2. Compute the manufacturing cycle efficiency (MCE) for the quarter. (Round your percentage answer to nearest whole percent.) 3. What percentage of the throughput time was spent in non-value-added activities? (Round your percentage answer to nearest whole percent.) 4. Compute the delivery cycle time. (Round your intermediate calculations and final answer to 1 decimal place.) 5. If by using Lean Production all queue time during production is eliminated, what will be the new MCE? (Do not round intermediate calculations. Round your…arrow_forward
- Management of Mittel Rhein AG of Köln, Germany, would like to reduce the amount of time between when a customer places an order and when the order is shipped. For the first quarter of operations during the current year the following data were reported: Inspection time Wait time (from order to start of production) Process time Move time Queue time Required: 1. Compute the throughput time. (Round your answer to 1 decimal place.) 2. Compute the manufacturing cycle efficiency (MCE) for the quarter. (Round your percentage answer to nearest whole percent.) 3. What percentage of the throughput time was spent in non-value-added activities? (Round your percentage answer to nearest whole percent.) 4. Compute the delivery cycle time. (Round your intermediate calculations and final answer to 1 decimal place.) 5. If by using Lean Production all queue time during production is eliminated, what will be the new MCE? (Round your percentage answer to 1 decimal place.) 1. Throughput time 2. Manufacturing…arrow_forwardProblem 1: The IT corporation produces and markets two types of electronic calculators: Model 11 and model 12. The following data were gathered on activities last month. Model 11 Model 12 Sales in units... Selling price per unit.. Variable production costs per unit.. Traceable fixed production costs.. Variable selling expenses per unit.. Traceable fixed selling expenses....... Allocated division administrative expenses.. $50,000 Prepare a segmented income statement in the contribution format for last month 5,000 $50 $10 $100,000 $5 5,000 3,000 $100 $26 $150,000 $6 7,500 $60,000arrow_forwardGive fast answer don't use aiarrow_forward
- Subject - account Please help me. Thankyou.arrow_forwardManagement of Mittel Company wants to reduce the elapsed time from when a customer places an order to when it is shipped. It provided the following data for a recent quarter: Inspection time Wait time (from order to start of production) Process time Move time Queue time Required: 1. Compute the throughput time. Note: Round your answer to 1 decimal place. 2. Compute the manufacturing cycle efficiency (MCE) for the quarter. Note: Round your percentage answer to nearest whole percent. 1. Throughput time 2. Manufacturing cycle efficiency 3. Non-value-added throughput time 0.3 day 15.9 days 3.1 days 3. What percentage of the throughput time was spent in non-value-added activities? Note: Round your percentage answer to nearest whole percent. 4. Compute the delivery cycle time. Note: Round your intermediate calculations and final answer to 1 decimal place. 5. If using Lean Production eliminates all queue time, what will be the new MCE? Note: Do not round intermediate calculations. Round your…arrow_forwardNeed answer the accounting question please answer do fastarrow_forward
- (Appendix 11A) Balanced Scorecard The following list gives a number of measures associated with the Balanced Scorecard: a. Number of new customers b. Percentage of customer complaints resolved with one contact c. Unit product cost d. Cost per distribution channel e. Suggestions per employee f. Warranty repair costs g. Consumer satisfaction (from surveys) h. Cycle time for solving a customer problem i. Strategic job coverage ratio j. On-time delivery percentage k. Percentage of revenues from new products Required: 1. Classify each performance measure as belonging to one of the following perspectives: financial, customer, internal business process, or learning and growth. 2. Suggest an additional measure for each of the four perspectives.arrow_forward(Appendix 11A) Manufacturing Cycle Efficiency Kurena Company provided the following information on one of its factories: Maximum units produced in a quarter: 180,000 units Actual units produced in a quarter: 112,500 units Hours of cell production labor in a quarter: 30,000 hours Theoretical cycle time: 10 minutes per unit Actual cycle time: 16 minutes per unit Required: 1. Calculate the amount of processing time per unit and the amount of nonprocessing time per unit. 2. Calculate the MCE (rounded to three significant digits).arrow_forwardContribution margin, break-even sales, cost-volume-profit chart, margin of safety, and operating leverage Belmain Co. expects to maintain the same inventories at the end of 20Y7 as at the beginning of the year. The total of all production costs for the year is therefore assumed to be equal to the cost of goods sold. With this in mind, the various department heads were asked to submit estimates of the costs for their departments during the year. A summary report of these estimates is as follows: It is expected that 12,000 units will be sold at a price of 240 a unit. Maximum sales within the relevant range are 18,000 units. Instructions 1. Prepare an estimated income statement for 20Y7. 2. What is the expected contribution margin ratio? 3. Determine the break-even sales in units and dollars. 4. Construct a cost-volume-profit chart indicating the break-even sales. 5. What is the expected margin of safety in dollars and as a percentage of sales? (Round to one decimal place.) 6. Determine the operating leverage.arrow_forward
- Managerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage LearningManagerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College PubPkg Acc Infor Systems MS VISIO CDFinanceISBN:9781133935940Author:Ulric J. GelinasPublisher:CENGAGE L
- Financial And Managerial AccountingAccountingISBN:9781337902663Author:WARREN, Carl S.Publisher:Cengage Learning,