Traffic and Highway Engineering
Traffic and Highway Engineering
5th Edition
ISBN: 9781305156241
Author: Garber, Nicholas J.
Publisher: Cengage Learning
bartleby

Concept explainers

Question
Book Icon
Chapter 12, Problem 1P
To determine

The description of the two basic demand forecasting situations in transportation planning.

Expert Solution & Answer
Check Mark

Explanation of Solution

Introduction:

The number of vehicles or persons per unit time under a set of given land-use, socioeconomic, and environmental conditions that are expected to travel on a given transportation system are expressed as the travel demand.

In transportation planning, there are two basic demand-forecasting situations.

  1. One situation involves travel demand studies for urban areas
  2. Second situation deals with intercity travel demand.

The first one forecasts, was developed in the 1950s and 1960s, and it requires extensive data which can be prepared by surveys such as home interview or roadside interview. The information collected by these surveys provides useful information of the trip maker such as age, income, sex, mode of travel, auto ownership etc.

Data gathered about travel characteristic can be further aggregated by the zone for formulating the relationships between the variables and then for the calibration of various models.

The second demand forecasting situations gathers data on a larger extent than for the first one. The intercity travel collects data such as city population, average city income, and travel time or the travel cost between different cities.

Conclusion:

Thus, there are two basic demand-forecasting situations in transportation planning. The first one deals with the travel demand studies for urban areas, and the second one involves intercity travel demands.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
What would be the best way to handle when a contractor misses a concrete pour deadline which causes delays for other contractors?
Please solve manually
. The free fall distance was 1753 mm. The times for the release and catch recorded on the fall experiments were in millisecond: 222.22 800.00 61.11 641.67 0.00 588.89 11.11 588.89 8.33 588.89 11.11 588.89 5.56 586.11 2.78 583.33   Calculate the time taken for the fall for each experiment. Calculate for each fall the acceleration based on time and distance. Calculate the mean of the accelerations. Give in the answer window the calculated mean of accelerations in m/s2.
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning