Concept explainers
The trip distribution using the average growth factor method.

Answer to Problem 14P
The trip distribution has been developed using the average growth factor method.
Explanation of Solution
Given:
For Zone
Present total observed trip ends is
Zonal growth rate is
For Zone
Present total observed trip ends is
Zonal growth rate is
For Zone
Present total observed trip ends is
Zonal growth rate is
For Zone
Present total observed trip ends is
Zonal growth rate is
Formula used:
Estimated growth total is given by,
The number of trips estimated from zone
Here,
The new growth factor is given as,
Calculation:
The estimated growth total for zone
Substitute
The estimated growth total for zone
Substitute
The estimated growth total for zone
Substitute
The estimated growth total for zone
Substitute
The data of
Zones | |||
Table (1)
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The calculated trips from zone
Zones | |
Table (2)
The
The
Substitute
The
The
Substitute
The
The
Substitute
The
The
Substitute
The remaining movement between zones, new present total and new growth factor for zone s
Zones | New Present total | New Growth factor |
Table (3)
The estimated growth total for zone
Substitute
The estimated growth total for zone
Substitute
The estimated growth total for zone
Substitute
The estimated growth total for zone
Substitute
The data of
Zones | |||
Table (4)
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The number of trips estimated from zone
Substitute
The calculated trips from zone
Zones | |
Table (5)
The
The
Substitute
The
The
Substitute
The
The
Substitute
The
The
Substitute
The remaining movement between zones, new present total and new growth factor for zone
Zones | New Present total | New Growth factor |
| ||
Table (6)
Conclusion:
The trip distribution has been done using the average growth factor method.
Want to see more full solutions like this?
Chapter 12 Solutions
Traffic and Highway Engineering - With Mindtap
- I do not know how to approach this problemarrow_forwardConsider a pool of saturated water at atmospheric pressure. The base of the pool is made of thick polished copper square plate of length 1 m. To generate steam, exhaust gas is flowing underneath and parallel to the base plate with velocity 3 m/s and average temperate of 1090°C. The bottom surface the plate is at constant temperature of 110°. Use the properties of air for exhaust gas. a) Determine the boiling heat transfer rate. b) Determine the temperature of the top surface of the plate. Comment on the results. c) Examine the impact of your assumptions on your solutions. (what will change if any of the assumptions is not valid?)arrow_forward-The axial deflection pipe in inches. -The lateral deflection of the beam in inches -The total deflection of the beam like structure in inches ? all to 4 sig figs AI did not help. as i input what i get im not sure if its a rounding error or what.arrow_forward
- 1. For the foundation shown below: Qapp = 60 kips (Load obtained from structural engineer) 1.5 ft G.W.T. 3 ft Poorly Graded Sand (SP): Ym 115 pcf (above G.W.T.) Ysat 125 pcf (below G.W.T.) c' = 0, ' = 35° K Square footing, 4' x 4' Foundation Dimension Information: 1-ft x 1-ft square concrete column. 1-ft thick "foot" flanges. Yconc=150 pcf *Assume weight of reinforcing steel included in unit weight of concrete. *Assume compacted backfill weighs the same as in-situ soil. Assume this foundation is being designed for a warehouse that had a thorough preliminary soil exploration. Using the general bearing capacity equation: a. Calculate the gross applied bearing pressure, the gross ultimate bearing pressure, and determine if the foundation system is safe using a gross bearing capacity ASD approach. Please include the weight of the foundation, the weight of the backfill soil, and the effect of the uplift pressure caused by the presence of the water table in your bearing capacity…arrow_forward٢٥ ٠٥:٤٠١٠ 2025 ChatGPT VivaCut Onet Puzzle مسلم X Excel JPG I❤> PDF Copilot Chat Bot PDF2IMG iLovePDF NokoPrint O.O StudyX ☑ W CapCut Candy Crush DeepSeek Word ☐ Saga 啡 AcadAl ل TikTokarrow_forwardRefer to the figure below. Given: L = 7 m, y = 16.7 kN/m², and ø' = 30°. L L3 ση Sand γ $' D T LA L σε σε IN P Sand 1. Calculate the theoretical depth of penetration, D. (Enter your answer to three significant figures.) D= m 2. Calculate the maximum moment. (Enter your answer to three significant figures.) Mmax kN-m/marrow_forward
- Why is it important for construction project managers to be flexible when dealing with the many variable factors that pop up in a project?arrow_forwardWhat are some reasons for why a company would accelerate a construction project?arrow_forwardFor the design of a shallow foundation, given the following: Soil: ' = 20° c' = 52 kN/m² Unit weight, y = 15 kN/m³ Modulus of elasticity, E, = 1400 kN/m² Poisson's ratio, μs = 0.35 Foundation: L=2m B=1m Df = 1 m Calculate the ultimate bearing capacity. Use the equation: 1 - qu = c' NcFcs Fcd Fcc +qNqFqsFqdFqc + ½√BN√Fãs F√dƑxc 2 For '=20°, Nc = 14.83, N₁ = 6.4, and N₁ = 5.39. (Enter your answer to three significant figures.) qu = kN/m²arrow_forward
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningEngineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
- Residential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage Learning