Chapter 11, Problem 16P
To determine
Find the payback period for the facility.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Need asap...
A village has 1,182 persons. Each person uses 13.4 kWh of electricity per day. They are considering installing a small run of river hydroelectric facility where the flow rate is 3.0 m3/s and the equivalent head is 20 m. The system has 90% efficiency and pipe losses are expected to be 5%. Determine if the proposed run-of-river facility can produce the required daily energy requirements if a micro hydrokinetic water turbine is used.
(a)Evaluate hydropower plants in terms of social and economic impact with your own evaluation.
(b)Hydropower plants could be classified according to the quantity of water, water head, plant capacity, and load characteristics. Categorize the hydropower plants according to the water head.
3. Explain different components of small hydroelectric power system and their design considerations.
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- A constituent of a city proposed to build a hydroelectric powerplant to extract power from a waterfall that is 69 meters high and has an average discharge of 4.20 m³/s. The mayor promised to consider the project if it yields at least 2.5 MW of power even if the turbine efficiency is at 70%. Will this project be considered or not?arrow_forwardA generating system consists of the following units:(A) 1 x 10 MW unit(B) 1 x 20 MW unit(C) 1 x 30 MW unit(D) 1 x 40 MW unitThe 10, 20 and 30 MW units have forced outage rates of0.08. The 40 MW unit has afull forced outage rate of0.08 and a 50% derated state which has a probability of0.06. (a) Calculate the LOLE for this system for a single daily peak load of 60 MW. (b) Whatis the LOLE for the same condition if the 40 MW unit is represented as a two-statemodel using an Equivalent Forced Outage Rate?arrow_forwardWelcome to the family of TechCrachi, Recently you've asked for Unblur this Chegg Question on our website:Determine the total energy production of a run-of-river plant having an total efficiency of 85%. It receives flow by means of a penstock, 400m long with 1.2m diameter, and f=0.015 in Darcy-Weisbach equation. The available head is 200m and seasonal fluctuations of upstream and downstream water levels are ignored. The flow duration data are tabulated as below.Q (m3/s) 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0Duration, t (%) 100 95 80 65 55 40 35 25 20 10arrow_forward
- Problem- Two turbo-generators, each capacity 25,000 kW, have been installed at a hydel power station. The load on the hydel plant varies from 15,000 kW to 40,000 kW. What is the total installed plant capacity and the load factor.arrow_forwardA megascale hydro project being considered will require approximately 1 million tons of concrete for the dam structure alone. The plant should produce about 2,000 MWe of power for its entire lifetime of about 100 years. How large an impact might this plant have on GHG emissions?arrow_forwardCalculate the continuous power that will be available from hydroelectric plant having an available headof 300 meters, catchment area of 150 sq. km, annual rainfall 1·25 m and yield factor of 50%. Assumepenstock, turbine and generator efficiencies to be 96%, 86% and 97% respectively. If the load factor is40% what should be the rating of the generators installed ?arrow_forward
- During a prefeasibility survey, you have identified a feasible site for a micro hydropower scheme. If you’ve measured a gross head of 40 m, and from the hydrological analysis, a design flow of 150 l/s appears to be available throughout the year, what would be the likely installed capacity? Assume an overall efficiency of 60%.arrow_forwardProvide complete answerarrow_forwardI need the answer as soon as possiblearrow_forward
- The Stortemelk hydropower project consists of a single 4.4 MW vertical Kaplan turbine installed at the Botterkloof Dam on the Ash River near Clarens, in the Free State Province of South Africa.Construction commenced in September 2014, completed on time and commissioned in June 2016 using more than 150 different companies at a cost of R2.5 billion. Day to day operations is repetitive ongoing work. Projects are different from operations, state any five project attributes.arrow_forwardPls answer thank you! At a proposed hydroelectric plant site, the average elevation of headwater is 600 m, the tailwater elevation is 480 m. The average annual water flow is determined to be equal to the volume flowing through a rectangular channel 4 m wide and 0.5 m deep and average velocity of 5.5 m/sec. Assuming that the plant site can develop if the hydraulic turbine that will be used has an efficiency of 80% and generator efficiency of 92%. Consider a headwork loss of 4% of the available head. Find the annual energy produce in kW.arrow_forward(a) Discuss why hydro power generation is said to be multi purpose.Give examplesarrow_forward