The levelized cost of energy (LCOE) for coal-fired electricity is about $0.09/kWh. Suppose the capital cost of the plant is $600 million and it operates for 40 years with a capacity factor of 95%. What is the contribution of CAPEX to LCOE? Given the difference you (hopefully) find, what contributes the remaining costs?
Installed capacity of the plant 200 MW
Capital cost = Rs 400 crores
Rate of interest and depreciation= 12%
Annual cost of fuel, salaries and taxation = Rs 5 crores
Load factor = 50%
Also estimate the saving in cost per kWh if the annual load factor is raised to
60%.
calculate the cost of generation per kwh for a
power station.
The demand for electric power is usually much higher during the day than it is at night, and utility companies often sell power at night at much lower prices to encourage consumers to use the available power generation capacity and to avoid building new expensive power plants that will be used only a short time during peak periods. Utilities are also willing to purchase power produced during the day from private parties at a high price.
Suppose a utility company is selling electric power for $0.06/kWh at night and is willing to pay $0.13/kWh for power produced during the day. To take advantage of this opportunity, an entrepreneur is considering building a large reservoir 50 m above the lake level, pumping water from the lake to the reservoir at night using cheap power, and letting the water flow from the reservoir back to the lake during the day, producing power as the pump–motor operates as a turbine–generator during reverse flow. Preliminary analysis shows that a water flow rate of 2…
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- 2. Consider the system described in the news: at night, when there is energy left, water is pumped from a large lake to a reservoir at 80 m above the lake level. During the day, this water is used to generate energy in a turbine located 80 m below the elevated reservoir. Considering that the water flow is always 5000 liters/s (both at the inlet of the reservoir and at the outlet) and that the pump and turbine efficiencies are 70%, what is the power (in kW) required by the pump and the power (in kW) recovered in the turbine. Data: The pipe diameter is always the same along the system (d = 0.5 m); g = 10 m/s2; γ = 9810 N/m3. Matter transport phenomena; Please make it typeable as handwriting interferes with understandingarrow_forwardIn the figure shown below, it is desired to pump3,177,640 lit/ day of water from a streamto a pool. Ei A = 55 m while El. B = 103 m.If the combined pump and motor efficiencvis 89%, calculate the monthly power cost in pesosif electricity rate is ₱10 per Kw-hr. Assume that thepump operates for 24 hours and take 1 month =31 days. A. 152, 631.3618 B. 692,531.8213 C. 451,371.0313 D.563, 903.0421arrow_forwardAn oil refinery is willing to install a 60,000-lb/hour pump for $325,000 in 2020 when the pump index had a value of 500. The refinery must also install another pump of the same size in 2024. Economic data shows that the pump index is forecast to rise by 5% annually. What is the approximate cost of the new pump in 2024? (E). Cn = Ck Ikarrow_forward
- Compare the capitalized costs of the following penstocks for a hydro-electric plant withinterest at 10%: Timber SteelFirst Cost P50,000 P80,000Estimated Life 10 years 30 yearsScrap Value P2,000 N O N EAnnual Maintenance P1,200 P200arrow_forwardProblem 3. A nuclear-power station produces 750 MW per year as useful energy. costs include 150 MW lost in distribution, and 290 MW lost as heat. What is the efficiency of the plant? The energyarrow_forwardA constituent of a city proposed to build a hydroelectric powerplant to extract power from a waterfall that is 69 meters high and has an average discharge of 4.20 m³/s. The mayor promised to consider the project if it yields at least 2.5 MW of power even if the turbine efficiency is at 70%. Will this project be considered or not?arrow_forward
- IRR AND ERR METHODarrow_forwardProblem 10 A homeowner is trying to decide between a high-efficiency natural gas furnace with an efficiency of 95 percent and a ground-source heat pump with a COP of 3.3. The unit costs of electricity and natural gas are $0.112/kWh and $1.44/therm (1 therm = 105, 500 kJ). Determine which system will have a lower energy cost.arrow_forwardSix years ago, an 80-kW diesel-electric set cost $145,000. The cost index for this class of equipment six years ago was 187 and is now 194. The plant engineering staff was considering a 120-kW unit of the same general design to power a small isolated plant that would have cost $200,145. Based on the information above the plant engineering staff is considering a 100-kW unit of the same general design to power a small isolated plant. Assume we want to add a pre-compressor, which (when isolated and estimated separately) currently costs $10,000. Determine the total cost of the 100-kW unit.arrow_forward
- I need helparrow_forwardA home owner has a leaky bathroom faucet. If her faucet leaks 0.5 L/min and her water is heated to 45C with inlet water from a well supply at 15C then how much does the leak cost her per year? Assume her water is heated by propane at a cost of $0.65/L including tax using a boiler that is 85% efficient. Hint: 1 L of propane is equivalent to 23700 BTU. а. 776.58 ОБ. 984.20 O C. 1553.16 O d. 2329.75 е. 1121.84 O f. 1683.24arrow_forwardYou are considering purchasing a compact washing machine, and you have the following information: • The Energy Guide claims an estimated yearly electricity use of 350 kW-hrs, based on 8 loads of laundry being washed per week. • The Energy Guide claims an estimated yearly operating cost of $38. This estimate is based on $0.1065 per kW-hr, and eight loads of laundry being washed per week. • Local electricity costs $0.086 per kW-hr. • You wash four loads of laundry per week. Based on this information, first calculate the energy that would be used by this compact washing machine in a year. Then calculate the yearly energy cost. $3.27 $15.34 $19.00 $178.40arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Sustainable EnergyCivil EngineeringISBN:9781133108689Author:Richard A. DunlapPublisher:Cengage Learning
Sustainable Energy
Civil Engineering
ISBN:9781133108689
Author:Richard A. Dunlap
Publisher:Cengage Learning