Learning curve, cumulative average-time learning model. Northern Defense manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32. Manufacturing data for the RS-32 follow:
Calculate the total variable costs of producing 2, 4, and 8 units.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Cost estimation, cumulative average-time learning curve. The Pacific Boat Company, which is under contract to the U.S. Navy, assembles troop deployment boats. As part of its research program, it completes the assembly of the first of a new model (PT109) of deployment boats. The Navy is impressed with the PT109. It requests that Pacific Boat submit a proposal on the cost of producing another six PT109s. Pacific Boat reports the following cost information for the first PT109 assembled and uses a 90% cumulative average-time learning model as a basis for forecasting direct manufacturing labor-hours for the next six PT109s. (A 90% learning curve means b = −0.152004.)
A machine project is tasked to you, as shown below.
Figure 1: Garbage Collection Robot Using Wireless Communication Technology
(nevonprojects.com)
1. The actual machine will be mass-produced based on the machine in Figure 1. The
tooling (fixtures, moulds & dies) is estimated at RM100,000 with expected product
lifespan of 10,000 sets. Material cost is RM200 per set. Administration and overhead
cost are at RM250,000 per year. Production planning per month for the machine is at
300 sets. Determine the machine cost per set.
1. Compute the unit contribution margin for both models.
Chapter 10 Solutions
Cost Accounting (15th Edition)
Ch. 10 - What two assumptions are frequently made when...Ch. 10 - Describe three alternative linear cost functions.Ch. 10 - What is the difference between a linear and a...Ch. 10 - High correlation between two variables means that...Ch. 10 - Name four approaches to estimating a cost...Ch. 10 - Describe the conference method for estimating a...Ch. 10 - Describe the account analysis method for...Ch. 10 - List the six steps in estimating a cost function...Ch. 10 - When using the high-low method, should you base...Ch. 10 - Describe three criteria for evaluating cost...
Ch. 10 - Define learning curve. Outline two models that can...Ch. 10 - Discuss four frequently encountered problems when...Ch. 10 - Prob. 10.13QCh. 10 - All the independent variables in a cost function...Ch. 10 - Multicollinearity exists when the dependent...Ch. 10 - Prob. 10.16ECh. 10 - Prob. 10.17ECh. 10 - Various cost-behavior patterns. (CPA, adapted)....Ch. 10 - Matching graphs with descriptions of cost and...Ch. 10 - Prob. 10.20ECh. 10 - Prob. 10.21ECh. 10 - Prob. 10.22ECh. 10 - Prob. 10.23ECh. 10 - Prob. 10.24ECh. 10 - Prob. 10.25ECh. 10 - Prob. 10.26ECh. 10 - Prob. 10.27ECh. 10 - Learning curve, cumulative average-time learning...Ch. 10 - Learning curve, incremental unit-time learning...Ch. 10 - Prob. 10.30ECh. 10 - Prob. 10.31PCh. 10 - Prob. 10.32PCh. 10 - Prob. 10.33PCh. 10 - Interpreting regression results. Spirit...Ch. 10 - Prob. 10.35PCh. 10 - Prob. 10.36PCh. 10 - Regression; choosing among models. Apollo Hospital...Ch. 10 - Multiple regression (continuation of 10-42). After...Ch. 10 - Prob. 10.39PCh. 10 - Prob. 10.40PCh. 10 - Interpreting regression results, matching time...Ch. 10 - Prob. 10.42PCh. 10 - Prob. 10.43P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Theory of constraints, throughput margin, and relevant costs. Washington Industries manufactures electronic testing equipment. Washington also installs the equipment at customers’ sites and ensures that it functions smoothly. Additional information on the manufacturing and installation departments is as follows (capacities are expressed in terms of the number of units of electronic testing equipment): Washington manufactures only 250 units per year because the installation department has only enough capacity to install 250 units. The equipment sells for $55,000 per unit (installed) and has direct material costs of $30,000. All costs other than direct material costs are fixed. The following requirements refer only to the preceding data. There is no connection between the requirements.arrow_forwardAssume the same information for the Pacific Boat Company as in Problem 10-40 with one exception. This exception is that Pacific Boat uses a 90% incremental unit-time learning model as a basis for predicting direct manufacturing labor-hours in its assembling operations. (A 90% learning curve means b = -0.152004.) Q. Prepare a prediction of the total costs for producing the six PT109s for the Navy.arrow_forwardKelson Sporting Equipment, Inc., makes two types of baseball gloves: a regular model and a catchers model. The firm has 900 hours of production time available in its cutting and sewing department, 300 hours available in its finishing department, and 100 hours available in its packaging and shipping department. The production time requirements and the profit contribution per glove are given in the following table: Assuming that the company is interested in maximizing the total profit contribution, answer the following: a. What is the linear programming model for this problem? b. Develop a spreadsheet model and find the optimal solution using Excel Solver. How many of each model should Kelson manufacture? c. What is the total profit contribution Kelson can earn with the optimal production quantities? d. How many hours of production time will be scheduled in each department? e. What is the slack time in each department?arrow_forward
- Classifying quality costs and using these costs to make decisions Clason, Inc. manufactures door panels. Suppose Clason is considering spending the following amounts on a new total quality management (TQM) program: Requirements Classify each cost as a prevention cost, an appraisal cost, an internal failure cost, or an external failure cost. Should Clason implement the new quality program? Give your reason.arrow_forwardWeathereye, Inc. manufactures weather satellites. The final assembly and testing of the satellites is a largely manual operation involving dozens of highly trained electronics technicians. The following learning curve has been estimated for the firm’s newest satellite model, which is about to enter production. Required:1. What will be the average labor time required to assemble and test each satellite when the company has produced four satellites? Eight satellites?2. What will be the total labor time required to assemble and test all satellites produced if the firm manufactures only four satellites? Eight satellites?3. How can the learning curve be used in the company’s budgeting process? In setting cost standards?arrow_forwardTransfer pricing, utilization of capacity. (J. Patell, adapted) Sierra Inc. consists of a semiconductor division and a processcontrol division, each of which operates as an independent prot center. The semiconductor division employs craftsmen who produce two different electronic components: the new highperformance Xcel-chip and an older product called the Dcel-chip. These products have the following cost characteristics:arrow_forward
- Circle the one best answer. 1.A standard which represents an efficient level of performance that is attainable under expected operating conditions is called a(n) a.ideal standard. b.loose standard. c.tight standard. d.normal standard. 2.Tom Thumb Pie Company developed the following per unit standards for its product: 4 pounds of direct materials at $24 per pound of direct materials. Last month Tom Thumb Pie Company purchased 4,000 pounds of direct materials for $95,400. The direct materials price variance for last month was a.$11,400 favorable. b.$600 favorable. c.$300 favorable. d.$600 unfavorable. 3.Jane and John’s Kitchen has a per unit standards for direct materials of 4 gallons at $8 per gallon. Last month Jane and John’s Kitchen purchased 22,400 gallons of direct materials at an actual cost of $84,800. 12,000 gallons were used to produce 3,400 units of jams and jellies. The direct materials quantity variance for last month was a.$12,800…arrow_forwardA firm has recently added a new product to their offerings. Manufacturing reports that production is going smoothly and factory workers are becoming familiar with the manufacture of this product. All expectations are that the current rate of learning will continue and the manufacture of future units will be more efficient (i.e., take less time). The following shown table shows the results for the first two units produced. The firm has an order for two additional units. Assuming the pattern of learning curve continues (same rate): Solve, a. At what rate is learning occurring? b. How long will it take to produce the fourth unit? c. If the labor rate is $15 per hour, what is the cumulative average labor cost per unit for the first four units produced?arrow_forwardPreparing a Standard Cost Card -Redwing EXO-7 Industries manufactures a Redwing reconnaissance drone. The following information pertains to its manufacturing costs. To make one redwing unit it takes 2 pounds of titanium and 0.5 pounds of carbon fiber. The company expects 0.01 pounds of waste for titanium and 0.02 waste for the carbon fiber materials. Titanium costs are anticipated at $10.25 per pound and carbon fiber costs are anticipated at $5.25 per pound. A 1% discount is offered to EXO-7 Industries from its suppliers. The redwing unit requires two labor processes to complete it -assembly and programming. Assembly laborers are paid $17 per hour and programming laborers are paid $27 per hour. Fringe benefits and payroll taxes for assembly and programming laborers amount to $1.75 and $5.25 per hour, respectively. Based on the company’s experience and research, it expects to use 5.0 hours of assembly and 10 hours of programming. The company uses direct labor hours as…arrow_forward
- The manufacturing process of a new product is very labor intensive. The learning curve percentage (LC) for the process is 90%. It took 30 hours with 15 workers together to produce the first product. The average labor cost including overhead expenses is about $20 per hour. (a) Estimate the labor cost (including overhead expenses) to produce the tenth product? (Hint: 2 steps. How long is T_10? How much is the cost?) (b) A new training program is intended to lower the learning-curve percentage by 10% (minus 10%). If the program is successful, what cost savings will be realized for the tenth unit? (Hint: How long is the new T_10? How much is the new cost? How much is the cost saving?)arrow_forwardIf a 70% learning curve is used, using the cumulative average time model, the cumulative direct labor hours required to produce a total eight units would be:arrow_forwardKagle design engineers are in the process of developing a new “green” product, one that will significantly reduce impact on the environment and yet still provide the desired customer functionality. Currently, two designs are being considered. The manager of Kagle has told the engineers that the cost for the new product cannot exceed $550 per unit (target cost). In the past, the Cost Accounting Department has given estimated costs using a unit-based system. At the request of the Engineering Department, Cost Accounting is providing both unit- and activity-based accounting information (made possible by a recent pilot study producing the activity-based data). Unit-based system:Variable conversion activity rate: $100 per direct labor hourMaterial usage rate: $20 per partABC system:Labor usage: $15 per direct labor hourMaterial usage (direct materials): $20 per partMachining: $75 per machine hourPurchasing activity: $150 per purchase orderSetup activity: $3,000 per setup hourWarranty…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Essentials of Business Analytics (MindTap Course ...StatisticsISBN:9781305627734Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. AndersonPublisher:Cengage LearningPrinciples of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax CollegeExcel Applications for Accounting PrinciplesAccountingISBN:9781111581565Author:Gaylord N. SmithPublisher:Cengage Learning
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
Essentials of Business Analytics (MindTap Course ...
Statistics
ISBN:9781305627734
Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. Anderson
Publisher:Cengage Learning
Principles of Accounting Volume 2
Accounting
ISBN:9781947172609
Author:OpenStax
Publisher:OpenStax College
Excel Applications for Accounting Principles
Accounting
ISBN:9781111581565
Author:Gaylord N. Smith
Publisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Cost control, Why cost control is necessary for a business?; Author: Educationleaves;https://www.youtube.com/watch?v=yMg3gJx48Fg;License: Standard youtube license