To determine: The labor productivity of producing bronze valves
Introduction: Productivity is a measure of the effectiveness of an individual, systems, machinery and other equipment that are used in converting inputs into outputs. In all organizations, productivity is an important determinant to know cost efficiency.
b)
To determine: The new labor productivity value of producing bronze valves.
Introduction: Productivity is a measure of the effectiveness of an individual, systems, machinery and other equipment that are used in converting inputs into outputs. In all organizations, productivity is an important determinant to know cost efficiency.
c)
To determine: The percentage of productivity increase.
Introduction: Productivity is a measure of the effectiveness of an individual, systems, machinery and other equipment that are used in converting inputs into outputs. In all organizations, productivity is an important determinant to know cost efficiency.
Want to see the full answer?
Check out a sample textbook solutionChapter 1 Solutions
PRIN.OF OPERATIONS MANAGEMENT-MYOMLAB
- ASAP!! ANSWER PLEASE Carbondale Casting produces cast bronze valves on a 15-person assembly line. On a recent day, 280 valves were produced during a 10-hour shift. Calculate the labor productivity of the line. John Goodale, the manager at Carbondale, changed the layout and was able to increase production to 300 units per 10-hour shift. What is the new labor productivity per labor-hour? What is the percentage of productivity increase?arrow_forwardCarbondale Casting produces cast bronze valves on a 10-person assembly line. On a recent day, 160 valves were pro-duced during an 8-hour shift. a) Calculate the labor productivity of the line.b) John Goodale, the manager at Carbondale, changed the layoutand was able to increase production to 180 units per 8-hourshift. What is the new labor productivity per labor-hour?c) What is the percentage of productivity increase?arrow_forwardMatthew Bailey, as manager of Designs by Bailey,is upgrading his CAD software. The high-performance (HP)software rents for $3,000 per month per workstation. Thestandard-performance (SP) software rents for $2,000 per monthper workstation. The productivity figures that he has availablesuggest that the HP software is faster for his kind of design.Therefore, with the HP software he will need five engineers and with the SP software he will need six. This translates into a vari-able cost of $200 per drawing for the HP system and $240 per drawing for the SP system. At his projected volume of 80 draw-ings per month, which system should he rent?arrow_forward
- Lake Charles Seafood makes 500 wooden packingboxes for fresh seafood per day, working in two 10-hour shifts. Due to increased demand, plant managers have decided to oper-ate three 8-hour shifts instead. The plant is now able to produce 650 boxes per day.a) Calculate the company’s productivity before the change inwork rules and after the change. b:) What is the percentage increase in productivity?c) If production is increased to 700 boxes per day, what is thenew productivity?arrow_forwardUsing Operations to Create Value”? Do multiple measures of cost, top quality, quality consistency, delivery speed, and on- time delivery meet or exceed expectations? Is there a good strategic fit in the process?arrow_forwardChuck Sox makes wooden boxes in which to shipmotorcycles. Chuck and his three employees invest a total of40 hours per day making the 120 boxes.a) What is their productivity?b) Chuck and his employees have discussed redesigning the process to improve efficiency. If they can increase the rate to 125per day, what will be their new productivity?c) What will be their unit increase in productivity per hour?d) What will be their percentage change in productivity?arrow_forward
- gift-wrapping business is staffed by Kaitlyn, Rob, Sam, Susan and Sarah. The production by each of these staff members for an average eight-hour work day is as follows: Jared Bob Sammy Janet Emily 64 packages 55 packages 52 packages 52 packages 48 packages What is Jared productivity? 8 hours/package 8 packages/hour 8 8 packages If expected productivity is to spend 10 minutes per package, what is Jareds efficiency? 1.3333 or 133.33% 6 packages/hour 8 packages/hour 0.75 or 75%arrow_forwardLake Charles Seafood makes 450 wooden packing boxes for fresh seafood per day, working in two 10-hour shifts. Due to increased demand, plant managers have decided to operate three 8-hour shifts per day instead. The plant is now able to produce 650 boxes per day. a) Before the change in work rules, the company's productivity per day = nothing boxes/hour (round your response to two decimal places).arrow_forwardCitadel Casting produces cast bronze valves on a 15-person assembly line. On a recent day, 120 valves were produced during an 8-hour shift. Kian Razzaghy, the new manager at Citadel, changed the layout and was able to increase production to 150 units per 8-hour shift. What is the percentage change in the productivity? (enter your response as a percentage rounded to two decimal place) 25% 1% 1.25% 22.5% 125%arrow_forward
- Lake Charles Seafood makes 500 wooden packing boxes for fresh seafood per day, working in two 10-hour shifts. Due to increased demand, plant managers have decided to operate three 8-hour shifts per day instead. The plant is now able to produce 650 boxes per day a) Before the change in work rules, the company's productivity per day: = boxes/hour (round your response to two decimal places). After the change, the new productivity level per day = boxes/hour (round your response to two decimal places). b) Based on the changes made, the percent increase in productivity = c) if production is increased to 700 boxes per day (with the three 8-hour shifts), the new productivity % (enter your response as a percentage rounded to two decimal places). = boxes/hour (round your response to two decimal places).arrow_forwardHokey Min's Kleen Karpet cleaned 65 rugs in October, consuming the following resources: 520 hours at $17 per hour 125 gallons at $5 per gallon 22 days at $75 per day a) Labor productivity per dollar = 0.0074 rugs/dollar (round your response to four decimal places). b) Multifactor productivity = rugs/dollar (round your response to four decimal places). Labor: Solvent: Machine Rental:arrow_forward14arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.