You are within two weeks of turnover of a three-story build-to-suit office building project. Many of the city inspections are complete and it appears that a certificate of occupancy (C of O) will be obtained on time. Only the fire protection, elevator, and life safety inspections remain. The mechanical, electrical, fire protection and life safety were all design-build systems. During the punch list, it is discovered that the fire protection subcontractor has installed a different type of sprinkler head on each floor. The first floor uses concealed heads with white escutcheons to match the ceiling tiles. The second floor uses decorative chrome head
You are within two weeks of turnover of a three-story build-to-suit office building project. Many of the city inspections are complete and it appears that a certificate of occupancy (C of O) will be obtained on time. Only the fire protection, elevator, and life safety inspections remain. The
Step by step
Solved in 2 steps