You are the engineer responsible for the design and installation of plumbing in a new public elementary school under construction. The project is running behind schedule ad above budget. The latest catch is that the supplier has not delivered the specified backflow preventers. Although a strike at the manufacturer’s plant has been settled, the back order list is moving slowly. The engineer serving as coordinator of the project orders you to obtain less expensive backflow preventers that are readily available from another manufacturer. These backflow preventers are of lesser quality than those specified in the plans, have a history of occasional failure, and are likely to need earlier replacement. What should you do?
You are the engineer responsible for the design and installation of plumbing in a new public elementary school under construction. The project is running behind schedule ad above budget. The latest catch is that the supplier has not delivered the specified backflow preventers. Although a strike at the manufacturer’s plant has been settled, the back order list is moving slowly. The engineer serving as coordinator of the project orders you to obtain less expensive backflow preventers that are readily available from another manufacturer. These backflow preventers are of lesser quality than those specified in the plans, have a history of occasional failure, and are likely to need earlier replacement. What should you do?
Trending now
This is a popular solution!
Step by step
Solved in 2 steps