Using production and geological data, the management of an oil company estimates that oil will be pumped from a producing field at a rate given by the following. 70 R(t) = +7; 0≤t≤ 15 t+7 R(t) is the rate of production (in thousands of barrels per year) t years after pumping begins. Find the area between the graph of R and the t-axis over the interval [6,11] and interpret the results. The area is approximately square units. (Round to the nearest integer as needed.) Choose the correct interpretation of the results below. OA. It will take approximately 59 years after pumping begins to reach a thousand barrels. B. Total production from the end of the sixth year to the end of the eleventh year will be approximately 58 thousand barrels. OC. It will take approximately 58 years after pumping begins to reach a thousand barrels. O D. Total production from the end of the first year to the end of the fifteenth year will be approximately 58 thousand barrels.
Using production and geological data, the management of an oil company estimates that oil will be pumped from a producing field at a rate given by the following. 70 R(t) = +7; 0≤t≤ 15 t+7 R(t) is the rate of production (in thousands of barrels per year) t years after pumping begins. Find the area between the graph of R and the t-axis over the interval [6,11] and interpret the results. The area is approximately square units. (Round to the nearest integer as needed.) Choose the correct interpretation of the results below. OA. It will take approximately 59 years after pumping begins to reach a thousand barrels. B. Total production from the end of the sixth year to the end of the eleventh year will be approximately 58 thousand barrels. OC. It will take approximately 58 years after pumping begins to reach a thousand barrels. O D. Total production from the end of the first year to the end of the fifteenth year will be approximately 58 thousand barrels.
Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
Related questions
Question
q9. please make the answers distinct from the problem solving. box the answers.
![Using production and geological data, the management of an oil company estimates that oil
will be pumped from a producing field at a rate given by the following.
R(t) =
=
70
t + 7
+7; 0≤t≤ 15
R(t) is the rate of production (in thousands of barrels per year) t years after pumping begins.
Find the area between the graph of R and the t-axis over the interval [6,11] and interpret the
results.
The area is approximately square units. (Round to the nearest integer as needed.)
Choose the correct interpretation of the results below.
O A. It will take approximately 59 years after pumping begins to reach a thousand
barrels.
B. Total production from the end of the sixth year to the end of the eleventh year will
be approximately 58 thousand barrels.
C. It will take approximately 58 years after pumping begins to reach a thousand
barrels.
D. Total production from the end of the first year to the end of the fifteenth year will be
approximately 58 thousand barrels.](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F686efa8b-b30e-4d7a-a343-e2084ffbea38%2F2b5a0de0-84e2-453a-96e8-e3aeea0486d7%2Fxj3kdld_processed.png&w=3840&q=75)
Transcribed Image Text:Using production and geological data, the management of an oil company estimates that oil
will be pumped from a producing field at a rate given by the following.
R(t) =
=
70
t + 7
+7; 0≤t≤ 15
R(t) is the rate of production (in thousands of barrels per year) t years after pumping begins.
Find the area between the graph of R and the t-axis over the interval [6,11] and interpret the
results.
The area is approximately square units. (Round to the nearest integer as needed.)
Choose the correct interpretation of the results below.
O A. It will take approximately 59 years after pumping begins to reach a thousand
barrels.
B. Total production from the end of the sixth year to the end of the eleventh year will
be approximately 58 thousand barrels.
C. It will take approximately 58 years after pumping begins to reach a thousand
barrels.
D. Total production from the end of the first year to the end of the fifteenth year will be
approximately 58 thousand barrels.
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
![Advanced Engineering Mathematics](https://www.bartleby.com/isbn_cover_images/9780470458365/9780470458365_smallCoverImage.gif)
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
![Numerical Methods for Engineers](https://www.bartleby.com/isbn_cover_images/9780073397924/9780073397924_smallCoverImage.gif)
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
![Introductory Mathematics for Engineering Applicat…](https://www.bartleby.com/isbn_cover_images/9781118141809/9781118141809_smallCoverImage.gif)
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
![Advanced Engineering Mathematics](https://www.bartleby.com/isbn_cover_images/9780470458365/9780470458365_smallCoverImage.gif)
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
![Numerical Methods for Engineers](https://www.bartleby.com/isbn_cover_images/9780073397924/9780073397924_smallCoverImage.gif)
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
![Introductory Mathematics for Engineering Applicat…](https://www.bartleby.com/isbn_cover_images/9781118141809/9781118141809_smallCoverImage.gif)
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
![Mathematics For Machine Technology](https://www.bartleby.com/isbn_cover_images/9781337798310/9781337798310_smallCoverImage.jpg)
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
![Basic Technical Mathematics](https://www.bartleby.com/isbn_cover_images/9780134437705/9780134437705_smallCoverImage.gif)
![Topology](https://www.bartleby.com/isbn_cover_images/9780134689517/9780134689517_smallCoverImage.gif)