Use ABC to allocate manufacturing overhead Several years after reengineering its production process, Dettling Corporation hired a new controller, Alana Metzgar. She developed an ABC system very similar to the one used by Dettling’s chief rival. Part of the reason Metzgar developed the ABC system was because Dettling’s profits had been declining, even though the company had shifted its product mix toward the product that had appeared most profitable under the old system. Before adopting the new ABC system, the company had used a plantwide overhead rate based on direct labor hours that was developed years ago. For the upcoming year, Dettling’s budgeted ABC manufacturing overhead allocation rates are as follows on the 1st picture: The number of parts is now a feasible allocation base because Dettling recently installed a plantwide computer system. Dettling produces two wheel models: Standard and Deluxe. Budgeted data for the upcoming year are as follows on the 2nd picture: The company’s managers expect to produce 1,000 units of each model during the year. Requirements 1. Compute the total budgeted manufacturing overhead cost for the upcoming year. 2. Compute the manufacturing overhead cost per wheel of each model using ABC. 3. Compute the company’s traditional plantwide overhead rate. Use this rate to determine the manufacturing overhead cost per wheel under the traditional system.
Use ABC to allocate manufacturing
Several years after reengineering its production process, Dettling Corporation hired a new controller, Alana Metzgar. She developed an ABC system very similar to the one used by Dettling’s chief rival. Part of the reason Metzgar developed the ABC system was because Dettling’s profits had been declining, even though the company had shifted its product mix toward the product that had appeared most profitable under the old system. Before adopting the new ABC system, the company had used a plantwide overhead rate based on direct labor hours that was developed years ago.
For the upcoming year, Dettling’s budgeted ABC manufacturing overhead allocation rates are as follows on the 1st picture:
The number of parts is now a feasible allocation base because Dettling recently installed a plantwide computer system. Dettling produces two wheel models: Standard and Deluxe. Budgeted data for the upcoming year are as follows on the 2nd picture:
Requirements
1. Compute the total budgeted
2. Compute the manufacturing overhead cost per wheel of each model using ABC.
3. Compute the company’s traditional plantwide overhead rate. Use this rate to determine the manufacturing overhead cost per wheel under the traditional system.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps