True or false 1. When there is an imbalance in the volume cuts ans fills in construction projects. It is often neccessary to borrow the required fill dirt from borrow pits outside the construction limits but near the fill side 2.The prismoidal method and prismoidal correction method yields the same volume 3. The side slopes of a cross section are expressed by a ratio of horizontal distance to vertical distance. 4. To make a hasty approximation of a cross-section area plotted on cross-section paper, count the number of squares enclosed by the boundary lines of the section. Then divide the total number of counted squares by the number of square feet represented by a single square. 5. To measure plotted areas longer than the capacity of the planimeter, ____ the area into sections and measure each seperately. Choices: divide, multiply, add, subtract
True or false
1. When there is an imbalance in the volume cuts ans fills in construction projects. It is often neccessary to borrow the required fill dirt from borrow pits outside the construction limits but near the fill side
2.The prismoidal method and prismoidal correction method yields the same volume
3. The side slopes of a cross section are expressed by a ratio of horizontal distance to vertical distance.
4. To make a hasty approximation of a cross-section area plotted on cross-section paper, count the number of squares enclosed by the boundary lines of the section. Then divide the total number of counted squares by the number of square feet represented by a single square.
5. To measure plotted areas longer than the capacity of the planimeter, ____ the area into sections and measure each seperately.
Choices: divide, multiply, add, subtract