True or False 1) Connecting a capacitor bank in parallel to an inductive load leads to a reduction in the total current consumed. 2) Voltage levels of 33kV, 11kV and 0.4kV are in operation within Iraqi transmission system. 3) The two-port ABCD parameters for a short transmission line are (A= D= 1 per unit, B=Z Ω and C=0). 4) The efficiency of a transmission line is defined as the ratio of received to sent apparat powers. 5) In a series dc motor, the armature current, the field current, and the line current are all the same. 6) The PID attempts to maximize the error by adjusting the process through use of a manipulated variable. 7) In the shunt connected DC motor, the equation that calculate electromagnetic torque
True or False
1) Connecting a capacitor bank in parallel to an inductive load leads to a reduction in the total current
consumed.
2) Voltage levels of 33kV, 11kV and 0.4kV are in operation within Iraqi transmission system.
3) The two-port ABCD parameters for a short transmission line are (A= D= 1 per unit, B=Z Ω and C=0).
4) The efficiency of a transmission line is defined as the ratio of received to sent apparat powers.
5) In a series dc motor, the armature current, the field current, and the line current are all the same.
6) The PID attempts to maximize the error by adjusting the process through use of a manipulated variable.
7) In the shunt connected DC motor, the equation that calculate electromagnetic torque is ??= ??????a