THIS IS NOT GRADED QUESTION, PLZ SOLVE IT AS SOON AS POSSIBLE. ENVIRONMENTALENGINEERING-2 Reg.NO: 5395 • In slide 2 and 3 increase the no of loads (Column 2) by 5. • Calculate the total load at the end of the day. • Calculate the capita (per home). The no of residences in the locality (from which the whole waste generates) is the last digit of your REGISTRATION NUMBER. For example, your registration number is19PWCIV 5395… the number of residences will be 5395
THIS IS NOT GRADED QUESTION, PLZ SOLVE IT AS SOON AS POSSIBLE. ENVIRONMENTALENGINEERING-2 Reg.NO: 5395 • In slide 2 and 3 increase the no of loads (Column 2) by 5. • Calculate the total load at the end of the day. • Calculate the capita (per home). The no of residences in the locality (from which the whole waste generates) is the last digit of your REGISTRATION NUMBER. For example, your registration number is19PWCIV 5395… the number of residences will be 5395
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
THIS IS NOT GRADED QUESTION, PLZ SOLVE IT AS SOON AS POSSIBLE.
ENVIRONMENTALENGINEERING-2
Reg.NO: 5395
• In slide 2 and 3 increase the no of loads (Column 2) by 5.
• Calculate the total load at the end of the day.
• Calculate the capita (per home). The no of residences in the locality (from which the whole waste generates) is the last digit of your REGISTRATION NUMBER. For example, your registration number is19PWCIV 5395… the number of residences will be 5395
![4
5
Solution step 1
I
Determine the number of homes
number of residence =
331270 X (lb/day) X (capita/day/3.82 lb) X
residence / 2.7 cap
number of residence = 32,118
What's wrong with the answer?
The demolition load, broken concrete may not
be representative; calculate the number of
houses with the concrete.
Solution step 1
number of residence =
(331,270-233,550) X (lb/day) X
(capita/day/3.82 lb) X residence / 2.7 cap
number of residence =
9,475 vs. 32,118 with the broken concrete.
Assignment
• In slide 2 and 3 increase the no of loads (Column 2) by 5.
• Calculate the total load at the end of the day.
• Calculate the capita (per home). The no of residences in the locality
(from which the whole waste generates) is the last digit of your
REGISTRATION NUMBER. For example, your registration number is
19PWCIV 5370... the number of residences will be 5370.](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F8bb629d7-8be5-47d1-99da-b2db3163f2af%2F25e38943-12f5-4f46-b052-3a36b25bf896%2Fmx5ik0e_processed.jpeg&w=3840&q=75)
Transcribed Image Text:4
5
Solution step 1
I
Determine the number of homes
number of residence =
331270 X (lb/day) X (capita/day/3.82 lb) X
residence / 2.7 cap
number of residence = 32,118
What's wrong with the answer?
The demolition load, broken concrete may not
be representative; calculate the number of
houses with the concrete.
Solution step 1
number of residence =
(331,270-233,550) X (lb/day) X
(capita/day/3.82 lb) X residence / 2.7 cap
number of residence =
9,475 vs. 32,118 with the broken concrete.
Assignment
• In slide 2 and 3 increase the no of loads (Column 2) by 5.
• Calculate the total load at the end of the day.
• Calculate the capita (per home). The no of residences in the locality
(from which the whole waste generates) is the last digit of your
REGISTRATION NUMBER. For example, your registration number is
19PWCIV 5370... the number of residences will be 5370.
![1
2
3
Assignment
To be submitted before examination
Given: On a single day you observe the following at
a landfill:
10-16 yd ³ compactor trucks.
18-3 yd ³ pickup trucks hauling loose and dry leaves.
56-1 yd 3 private cars.
2-45 yd ³ trucks with broken concrete.
Find: If there are 3.82 lb/cap/day with 2.7 cap/home and all
the waste comes from the town, estimate the number of homes
in the town?
Item
Specific
Number of
loads
Avg. Volume
yd3
Total Weight
lb
Weight
lb/yd3
col.2x3x4
Compactor truck
10
16
500
80,000
Pickup trucks
18
3
100
5,400
with leaves
loose and dry
Private cars
56
1
220
12,320
Broken concrete
2
45
2595
233,550
Total
lb/day
331,270](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F8bb629d7-8be5-47d1-99da-b2db3163f2af%2F25e38943-12f5-4f46-b052-3a36b25bf896%2Fynsvlgg_processed.jpeg&w=3840&q=75)
Transcribed Image Text:1
2
3
Assignment
To be submitted before examination
Given: On a single day you observe the following at
a landfill:
10-16 yd ³ compactor trucks.
18-3 yd ³ pickup trucks hauling loose and dry leaves.
56-1 yd 3 private cars.
2-45 yd ³ trucks with broken concrete.
Find: If there are 3.82 lb/cap/day with 2.7 cap/home and all
the waste comes from the town, estimate the number of homes
in the town?
Item
Specific
Number of
loads
Avg. Volume
yd3
Total Weight
lb
Weight
lb/yd3
col.2x3x4
Compactor truck
10
16
500
80,000
Pickup trucks
18
3
100
5,400
with leaves
loose and dry
Private cars
56
1
220
12,320
Broken concrete
2
45
2595
233,550
Total
lb/day
331,270
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning