the world’s tallest manmade structure. This impressive skyscraper, which reaches up to a record height of 828 m, is the focal point of the 500-acre mega-project 'Downtown Zutar' by SSS Properties. This project redefined what is possible in the design and engineering of supertall buildings. The tower has won numerous awards, notably in the fields of innovation, engineering excellence and architectural design. Project Name: Long Tower Client: SSS Properties Category: High Rise Building Period: 2004-2009 Location: Zurati, Zanzibar Project Website: PPM webs Stakeholders: Six Construct Total Value: US$930 million External: ZP Electronics Height: 828 m. 1.5 In light of the Long tower project examine what fact-based management would entail as a core quality concept of quality
In the centre of Zurati stands the Salita tower, the world’s tallest manmade structure. This impressive skyscraper, which reaches up to a record height of 828 m, is the focal point of the 500-acre mega-project 'Downtown Zutar' by SSS Properties. This project redefined what is possible in the design and engineering of supertall buildings. The tower has won numerous awards, notably in the fields of innovation, engineering excellence and
Fact-based management as a core quality concept entails making decisions and taking actions based on objective data and evidence rather than subjective opinions or assumptions.
- It involves gathering accurate and reliable data, analyzing it, and using it to inform decision-making processes and performance improvement initiatives.
In the context of the Long Tower project, fact-based management would involve:
Data-driven decision-making:
- Using reliable data and analysis to make informed decisions at every stage of the project, from design and construction to operational and maintenance planning. This could include collecting data on materials, costs, timelines, performance metrics, and customer feedback to drive decision-making processes.
Trending now
This is a popular solution!
Step by step
Solved in 3 steps