9. A rigging job calls for lifting a structure that weighs 150 tons. Two cranes are available, one with a rated capacity of 85 tons and the other with a rated capacity of 120 tons. The total weight of the rigging required to make the lift is 15 tons, of which 10 tons is to be carried by the larger crane and 5 tons is to be carried by the smaller crane. If the cranes are to be loaded in proportion to their net capacities, what should be the approximate net load on the 120-ton crane? A. 85 tons B. 44 tons C. 56 tons D. 63 tons
9. A rigging job calls for lifting a structure that weighs 150 tons. Two cranes are available, one with a rated capacity of 85 tons and the other with a rated capacity of 120 tons. The total weight of the rigging required to make the lift is 15 tons, of which 10 tons is to be carried by the larger crane and 5 tons is to be carried by the smaller crane. If the cranes are to be loaded in proportion to their net capacities, what should be the approximate net load on the 120-ton crane? A. 85 tons B. 44 tons C. 56 tons D. 63 tons
Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter4: Mechanical Processes
Section: Chapter Questions
Problem 4.7P
Related questions
Question
![9. A rigging job calls for lifting a structure that weighs 150 tons. Two cranes are available, one with a rated
capacity of 85 tons and the other with a rated capacity of 120 tons. The total weight of the rigging required
to make the lift is 15 tons, of which 10 tons is to be carried by the larger crane and 5 tons is to be carried
by the smaller crane. If the cranes are to be loaded in proportion to their net capacities, what should be the
approximate net load on the 120-ton crane?
A. 85 tons
B. 44 tons
C. 56 tons
D. 63 tons](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fa92906aa-cdac-4835-988f-325954d70829%2F9546ba9d-1b66-44db-9795-eaf8f17ce505%2F46g0c1_processed.jpeg&w=3840&q=75)
Transcribed Image Text:9. A rigging job calls for lifting a structure that weighs 150 tons. Two cranes are available, one with a rated
capacity of 85 tons and the other with a rated capacity of 120 tons. The total weight of the rigging required
to make the lift is 15 tons, of which 10 tons is to be carried by the larger crane and 5 tons is to be carried
by the smaller crane. If the cranes are to be loaded in proportion to their net capacities, what should be the
approximate net load on the 120-ton crane?
A. 85 tons
B. 44 tons
C. 56 tons
D. 63 tons
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Solid Waste Engineering](https://www.bartleby.com/isbn_cover_images/9781305635203/9781305635203_smallCoverImage.gif)
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
![Solid Waste Engineering](https://www.bartleby.com/isbn_cover_images/9781305635203/9781305635203_smallCoverImage.gif)
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,