The town of Gatesville has been directed to upgrade its primary WWTP to a secondary plant that can meet an effluent standard of 30.0 mg/L BOD5 and 30.0 mg/L suspended solids (SS). They have selected a completely mixed activated sludge system. Assuming that BOD5 of the SS may be estimated as equal to 57 percent of the SS concentration, estimate the required volume of the aeration tank. The following data are available from the existing primary plant. Existing plant effluent characteristics Flow =0.150 m3/s BOD5 =82.0 mg/L Assume the following values for the growth constants: Ks= 100 mg/L BOD5; µm =2.5 d-1; kd =0.050 d-1; Y = 0.50 mg VSS/ mg BOD5 removed. Assume the concentration of MLVSS is 2000 mg/L.
The town of Gatesville has been directed to upgrade its primary WWTP to a secondary plant that can meet an effluent standard of 30.0 mg/L BOD5 and 30.0 mg/L suspended solids (SS). They have selected a completely mixed activated sludge system. Assuming that BOD5 of the SS may be estimated as equal to 57 percent of the SS concentration, estimate the required volume of the aeration tank. The following data are available from the existing primary plant.
Existing plant effluent characteristics
Flow =0.150 m3/s
BOD5 =82.0 mg/L
Assume the following values for the growth constants: Ks= 100 mg/L BOD5; µm =2.5 d-1;
kd =0.050 d-1; Y = 0.50 mg VSS/ mg BOD5 removed. Assume the concentration of MLVSS is 2000 mg/L.
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 10 images