The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhad and $1.30 for fixed overhead) based on 100% capacity of 80,000 machine hours. The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows: Actual Variable Factory Overhead: $360,000 fixed factory overhead 104,000 Standard hours allowed for units produced: 60,000 hours What is the maount of the factory overhead volume variance & what is the amount of the factory overhead controllable variance? options for both are: a) 12,000U b) 12,000F c) 14000U d) 26000U
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
Please do not give solution in image format thanku
Trending now
This is a popular solution!
Step by step
Solved in 3 steps