The following shows cross-section notes for a road grading work. х1 x2 3.5 1.2 -3.2 1.2 2.8 In addition, the road width is 9m and the side slopes for cut is 1:1 and for fill, 1.5:1. Determine the Volume of CUT and the volume of FILL if the cross-section for earth works is constant all throughout a 31.6m length of road.
Basic Terminologies
Terminology is a systematic study for the implementation of the terms or words and their correspondence within their respective domain of human activity in the case of multilingual (more than 2) or bilingual (2) languages. Terminology is defined as the study of concepts, conceptual related phrases or expressions, and lexicography, on the other hand, is the discipline used to study any type of word and its meaning. Technical ventures and institutes create and gather their resources or word collection also known as a Glossary.
Common Units Of Pressure
Pressure is something that we experience in daily life but fail to recognize it as our body is so accustomed to it. For example, the atmospheric air applies pressure on our body, but we don’t feel it as we are exposed to it since birth and our body is habitual to it. When we write using a pen, we need to apply some pressure over the pen to make it start writing. But these are our day-to-day activity which we fail to recognize
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 4 images