The City of Forty-Five (population 465,565) has requested your assistance in evaluating its solid waste collection system. Determine the mean time per collection stop plus the mean time to reach the next stop, the number of pickup locations per load, and the minimum number of trucks the city must own. The City of Forty-Five collection data are as follows: Average truck capacity = 12.5 m3; Average observed compaction ratio = 2.87 Crew size = 2;  Number of pickups = 1 /wk (no rear-of-house service) Average number of cans per stop = 2.63/wk at 0.1136 m3/can Average number of residents per stop = 5 Average uncompacted density = 105.76 kg/m3 Average transport time to disposal site including delays and dumping = 1.78 h/trip Average number of trips to disposal site = 2/d; Rest breaks = 2 at 28.0 min Average maintenance downtime = 37.0 min/d; Average workday = 8.00 h Average percent of trucks out of service for major repairs = 15.0% Number of workday per week = 5

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
  • The City of Forty-Five (population 465,565) has requested your assistance in evaluating its solid waste collection system. Determine the mean time per collection stop plus the mean time to reach the next stop, the number of pickup locations per load, and the minimum number of trucks the city must own. The City of Forty-Five collection data are as follows:

Average truck capacity = 12.5 m3; Average observed compaction ratio = 2.87

Crew size = 2;  Number of pickups = 1 /wk (no rear-of-house service)

Average number of cans per stop = 2.63/wk at 0.1136 m3/can

Average number of residents per stop = 5

Average uncompacted density = 105.76 kg/m3

Average transport time to disposal site including delays and dumping = 1.78 h/trip

Average number of trips to disposal site = 2/d; Rest breaks = 2 at 28.0 min

Average maintenance downtime = 37.0 min/d; Average workday = 8.00 h

Average percent of trucks out of service for major repairs = 15.0%

Number of workday per week = 5

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps with 8 images

Blurred answer
Knowledge Booster
Collection systems
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning