Table 7.7 Data for Problem 7.2 Phase 3 4 Allowed movements Analysis flow rate EB L, WB L 245, 230 veh/h EB T/R, WB T/R 975, 1030 veh/h 3350, 3400 veh/h SB L, SB T/R 255, 235 veh/h NB L, NB T/R 225, 215 veh/h 1700, 1750 veh/h Saturation flow rate 1750, 1725 veh/h 1725, 1750 veh/h

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter9: Capacity And Level Of Service For Highway Segments
Section: Chapter Questions
Problem 17P
icon
Related questions
Question
100%

An intersection of four phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in table pictute below. Calculate the sum of flow ratios for critical lane groups.

Table 7.7 Data for Problem 7.2
Phase
3
4
Allowed movements
Analysis flow rate
EB L, WB L
245, 230 veh/h
EB T/R, WB T/R
975, 1030 veh/h
3350, 3400 veh/h
SB L, SB T/R
255, 235 veh/h
NB L, NB T/R
225, 215 veh/h
1700, 1750 veh/h
Saturation flow rate
1750, 1725 veh/h
1725, 1750 veh/h
Transcribed Image Text:Table 7.7 Data for Problem 7.2 Phase 3 4 Allowed movements Analysis flow rate EB L, WB L 245, 230 veh/h EB T/R, WB T/R 975, 1030 veh/h 3350, 3400 veh/h SB L, SB T/R 255, 235 veh/h NB L, NB T/R 225, 215 veh/h 1700, 1750 veh/h Saturation flow rate 1750, 1725 veh/h 1725, 1750 veh/h
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 8 steps with 16 images

Blurred answer
Knowledge Booster
Intersection control
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning