Suppose we have four (4) scrapers, each with an average load of 25 bcy. If the total cycle time for each scraper is 8 minutes, what would be the total production of these scrapers in bcy per hour if we assume a 50-minute hour efficiency?
Q: please solve the following problem with clear step by step solutions so I can understand the…
A: Step 3: Proceed with the Joints Method for the Remaining Joints To find the unknown forces in each…
Q: RCD
A: The total load on the footing is the sum of the axial dead load and the axial live load. In this…
Q: Design Problem 4 The pretensioned rectangular beam shown in Figure 4.0 has straight cables with…
A:
Q: A 5.55 mtpa LNG plant is being built in Pennsylvania in 2026. A similar plant built in Louisiana in…
A: Step 1: Scale the Cost Using the Capacity FactorGiven:- Capacity of Pennsylvania plant (B) : 5.55…
Q: y x M Find the Maximum Bending Stress if: M=38.7 kNm, J=13.9 mm, P=70.1 mm The position of the…
A: First, we need to convert the moment from kNm to Nmm. This is because the other measurements are…
Q: Please explain the answer.
A: Step 1: Sketch Draw two rectangular shapes to represent the reservoirs.Draw two rectangular shapes…
Q: The T-Beam shown is to resist a factored moment of 1500 kN.m. Design the tension steel requirements…
A:
Q: Circle final answers.
A: 1st image answers:2nd image answers:
Q: The 57.25 kg crate is hoisted up the 0 = 31° incline by the pulley system and motor M. If the crate…
A:
Q: Please find the centroid and Ixx for the following shapes. Show all work with neat handwriting and…
A: CentroidThe centroid of a plane figure is the geometric centre of the figure. It's the point where…
Q: This design project of a parking shed particularly focuses on load combinations and the design of…
A: Step 1: Design Load Combinations: Objective: Determine the critical load combinations on rafter B1…
Q: Please give answer fast.
A:
Q: Please don't use Chatgpt will upvote
A: Step 1: Find the support Reactions.Let Va and VD are the vertical support reactions at A and D.Step…
Q: 1- find the area of the region lies above the line y = -x and inside the circle r = -3cose
A:
Q: Please find the centroid x and y bar, and Ixx for the following shapes. Show all work with neat…
A: Approach to solving the question: Detailed explanation:Examples: Key references:
Q: Please solve using paper.Problem 10. A ball weighing 20 kg is placed as shown in the figure. If the…
A: Step 1: Step 2
Q: For the simply-supported and cantilever beams given below, use Singularity Functions to determine…
A:
Q: Determine the reactions at the supports for the beam shown. Show handwritten free body diagram and…
A:
Q: It isn' grade assignment. Just a work and practice.
A: Step 1Given, unit weight of concreteγ=145pcf=12×12×12145=0.0839lb/in3Width of section = b =…
Q: Determine the force in each member of the truss shown by the method of joints. Show free body…
A:
Q: Answer fast
A: Step 1:Step 2:Step 3:Step 4:
Q: Please find the centroid and Ixx for the following shapes. Show all work with neat handwriting and…
A:
Q: ANALYSE THE FRAME AND FIND IT'S REACTIONS AND INTERNAL MOMENT USING THE FORCE METHOA 4kN/m Assume EI…
A: The Problem:The given frame is a simply supported beam with a uniformly distributed load (UDL) of 4…
Q: Design Problem 3 The pretensioned circular beam shown below has straight cables with initial stress…
A: Step 1Step 2:
Q: Grades of g₁ = -2.50% and 92 = +1.50%, VPI elevation 860.00 ft at station 22 +00, and a fixed…
A: To solve this problem, we need to calculate the elevations of an equal-tangent vertical curve given…
Q: A tank in the shape of an inverted right circular cone is full of water. The water weighs 62.462.4…
A: We must first determine the volume of water in the tank in order to utilize the density of water to…
Q: Please answer this, i will give upvote
A: Let's calculate the deflection at point B using the Direct Integration Method (DIM).Step1: Given…
Q: Eigenvalues and eigenvectors
A: 1) The procedure for obtaining the eigenvalues and eigenvectors for the first matrix are as…
Q: Are there particuliar areas in the south where permeable pavement is used?
A: https://www.epa.gov/soakuptherain/soak-rain-permeable-pavement
Q: do it handwritten please
A: Step 1:
Q: Answer fast
A: Approach to solving the question: Detailed explanation: Examples: Key references:
Q: Complete the earthwork calculation sheet here and plot the resulting mass diagram. Divide ccy by 0.9…
A:
Q: Please solve using paper Problem 8. If w0 = 15 kN/m and L = 12 m, determine the resultant of the…
A: The resultant of the line loads can be calculated using the formula for the resultant of a uniformly…
Q: Please answer fast
A: i) Specific energy of the flowing water It is calculated as: E=y+2gV2 where: y = flow depth (m) V…
Q: ▾ Part A What is the area of the rectangular field whose dimensions are 248.03 ± 0.05 ft by 200.79 ±…
A:
Q: A force F is applied on the assembly as shown. The component in the t-axis of force F is equal to…
A: Approach to solving the question: Detailed explanation:Examples: Key references:
Q: From the given truss shown compute the force in member ED FD, and FC
A: Step 1: Step 2:
Q: d) The following table represents the payoff matrix with respect to Player A. Indicate whether the…
A: To determine whether the game has a saddle point, find the optimum strategies for both players, and…
Q: Which of the following categories of projects is often publicly funded and also termed…
A: The question is asking us to identify which category of projects is often funded by public money and…
Q: Solution: 8,412.00 m² Site Details: Section Width (S)-12 m 13 m 49 m 51 m 58 m 60 m 60 m 57 m…
A: Step 1: Analyzing the Excavation Site Understanding the Data:The excavation site is divided into…
Q: PROBLEM 20: Cables AB, AC, and AD supports the flower vase as shown. Write the tension in each cable…
A: ANSWER : Analyzing the Problem Understanding the Setup:Equilibrium: The flower vase is in…
Q: Please explain the answer in detail.
A: Steep Roof Slope: A steep roof slope is typically defined as having a slope greater than 21:12. This…
Q: What is the composite index for skilled labor in a saturated labor market given the following…
A: To calculate the composite index for skilled labor in a saturated labor market using the provided…
Q: Please calculate the following for the following problems. Please show all the work with…
A: Step 1: Step 2: Step 3: Step 4:
Q: number of significant digits; the tolerance is +_1 in the third significant digit
A: Step 1: At joint C, the forces are FCE,FCD and the external Load of 5.5kNSum of forces in y…
Q: solve the following problem with the correct answer please, please make sure to show all work so I…
A: Step 1: Step 2: Step 3: Step 4:
Q: help please answer in text form with proper workings and explanation for each and every part and…
A: The Gram stain result shows that the bacteria are round and purple. The round shape indicates that…
Q: The unstretched length of springs AB and AC are 0.8485 m and 3 m, respectively. The weight of the…
A:
Q: solve thee following problem with the correct answer please, please make sure to show so I can…
A: Let's give it a try. I hope it helps. Key Concepts:1. Slenderness Ratio (λ): This is a measure of…
Q: please solve the following problem with step by step solutions with neat hand writing so it can be…
A: Step 1: Euler's buckling formula P cr = π² E I / (K L)²WhereP cr = Critical buckling loadE =…
Suppose we have four (4) scrapers, each with an average load of 25 bcy. If the total cycle time for each scraper is 8 minutes, what would be the total production of these scrapers in bcy per hour if we assume a 50-minute hour efficiency?
Step by step
Solved in 2 steps
- A power shovel is fitted with an engine of 150 f.w.h.p. It operates on full load for 6 minutes followed by 8 minutes of idling at one-third power. Its hourly utilization is for 3 cycles. What is its utilization factor?I need the answer as soon as possibleA fleet of 16 scrapers is available for a job and the plan is to use tandem pushers and the shuttle loading method. If the expected production of a single scraper is 300 LCY/h and the expected cycle time for a wheeled scraper is 5.9 minute: a. Calculate the number of pushers required to serve the fleet b. Calculate the production of the fleet in (BCY/h) if only 2 pushers are available. The soil has 15% Swell.
- Determine the cycle time for a single-engine scraper rated at 21 cy heaped that is used to haul material from a pit to a fill 900ft away under severe conditions. The average haul speed will be 14 mph. the average return speed will be 20 mph. Assume at an average speed of 5 mph, that 200ft is required to both accelerate and decelerate. The operating efficiency will be equal to a 50-min hour. It will take 0.80 min to load this scraper.A 5.55 mtpa LNG plant is being built in Pennsylvania in 2026. A similar plant built in Louisiana in 2014, with a 7.75 mtpa at a cost of $4.35 billion. Use an e factor of 0.80 Adjustments are as follows: The Pennsylvania plant requires $1.2 billion in rock blasting not required in Louisiana. The Louisiana plant will have an extra LNG tank that won’t be at the Pennsylvania plant that costs $688 millon. The project expects an escalation of 3.30 from 2014 to 2026. Do the CFE calculation after the adjustment.7. A hydraulic shovel will be used to excavate sandy clay and load it into a 12 BCY dump truck. The shovel production at 100% efficiency is estimated to be 300 BCY/hour and job efficiency is 0.80. Truck travel time is estimated to be 8.0 minutes and truck fixed cycle time (excluding loading) is estimated to be 2.0 minutes. Equipment costs for the shovel and trucks are $40/h (shovel) and $20/h (truck). A. How many trucks are theoretically required to obtain maximum production? B. What is the expected production of the system in banked measure using this number of trucks? C. What is the expected unit loading and hauling costs in $/BCY?
- Optimization problem: An open top container of length L, width W and height H is used to transport ore. The cost for the surface area is $ 100/m2; cost of weld is $ 10/m; 400 m³ of ore is to be transported in no more than 50 trips; the length is not to exceed 3 m and width not to exceed 2 m. Formulate the optimization problem to solve for the maximum volume of the container.Question: Each of the four silos seen in the figure has an empty weight of 30MN, and can hold up to 105 MN of grain. The weight of the mat is 55 MN. Since each silo is filled independently, the resultant load imposed on the mat does not necessarily act through the centroid. Evaluate the various loading conditions and determine whether centrally loaded, one-way eccentric loaded, and two-way eccentric loading requirements will be met. If these requirements are not met, determine the minimum mat width, B, needed to satisfy these requirements. Allowable bearing capacity is given as qa=265kPa). 50m 12,5m Plan 50m 12,5m Profile Mat foundationDetermine the tonnage or capacity/truck using the following parameters: Ore hauling Cycle time = 30 minutes hauling time = 18 hrs/day Production target = 30,000 tons per day Truck Capacity = 100 tonner Truck factor = 85 %
- A concrete pour of 1080 cum is planned with a 120 cum/hr capacity. If the efficiency of the plant is assumed to 75%, what will be approximate time taken for completing pour? theI need answer within 20 minutes please please with my best wishesIt is determined that a 5-m width-of-cut combine is traveling 1.5-m/s. In one minute’s time 50 kg of grain are collected in the grain tank and 60kg of material are discharged out of the rear of the machine. Find the machine capacities: field capacity, (ha/hr) material capacity (kg/hr), throughput capacity, (ton/hr)