Suppose a certain manufacturing company produces connecting rods for 4- and 6-cylinder automobile engines using the same production line. The cost required to set up the production line to produce the 4-cylinder connecting rods is $2,500, and the cost required to set up the production line for the 6-cylinder connecting rods is $3,900. Manufacturing costs are $13 for each 4-cylinder connecting rod and $16 for each 6-cylinder connecting rod. Hawkins makes a decision at the end of each week as to which product will be manufactured the following week. If a production changeover is necessary from one week to the next, the weekend is used to reconfigure the production line. Once the line has been set up, the weekly production capacities are 6,000 6-cylinder connecting rods and 8,000 4-cylinder connecting rods. Let x4 = the number of 4-cylinder connecting rods produced next week x6 = the number of 6-cylinder connecting rods produced next week s4 = 1 if the production line is set up to produce the 4-cylinder connecting rods; 0 if otherwise s6 = 1 if the production line is set up to produce the 6-cylinder connecting rods; 0 if otherwise (a) Using the decision variables x4 and s4, write a constraint that limits next week's production of the 4-cylinder connecting rods to either 0 or 8,000 units.       (b) Using the decision variables x6 and s6, write a constraint that limits next week's production of the 6-cylinder connecting rods to either 0 or 6,000 units.       (c) Write a third constraint that, taken with the constraints from parts (a) and (b), limits the production of connecting rods for next week.       (d) Write an objective function for minimizing the cost of production for next week. Min

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
Suppose a certain manufacturing company produces connecting rods for 4- and 6-cylinder automobile engines using the same production line. The cost required to set up the production line to produce the 4-cylinder connecting rods is $2,500, and the cost required to set up the production line for the 6-cylinder connecting rods is $3,900. Manufacturing costs are $13 for each 4-cylinder connecting rod and $16 for each 6-cylinder connecting rod. Hawkins makes a decision at the end of each week as to which product will be manufactured the following week. If a production changeover is necessary from one week to the next, the weekend is used to reconfigure the production line. Once the line has been set up, the weekly production capacities are 6,000 6-cylinder connecting rods and 8,000 4-cylinder connecting rods. Let
  • x4 = the number of 4-cylinder connecting rods produced next week
  • x6 = the number of 6-cylinder connecting rods produced next week
  • s4 = 1 if the production line is set up to produce the 4-cylinder connecting rods; 0 if otherwise
  • s6 = 1 if the production line is set up to produce the 6-cylinder connecting rods; 0 if otherwise
(a)
Using the decision variables x4 and s4, write a constraint that limits next week's production of the 4-cylinder connecting rods to either 0 or 8,000 units.
 
 
 
(b)
Using the decision variables x6 and s6, write a constraint that limits next week's production of the 6-cylinder connecting rods to either 0 or 6,000 units.
 
 
 
(c)
Write a third constraint that, taken with the constraints from parts (a) and (b), limits the production of connecting rods for next week.
 
 
 
(d)
Write an objective function for minimizing the cost of production for next week.
Min     
 
 
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,