SITUATION NO. 02 P14-P1S Given the following field notes for a differential leveling All units are in meters. SITUATION NO. 03: P18-P20 A triangular parcel ABC have the following technical description: STATION 115 HI PS ELEV SIDE BEARING LENGTH BMI v 236.46 235.21 A 0.98 235.99 1.45 AB N60°30' W 68.75m B 234.30 2.12 233.87 C 023 232.66 1.07 232.43 BC N80°30'E 125.90m D 045 y 132 231.34 CA 7 E 076 23023 2.32 F 021 228.63 1.81 228.42 PROBLEM NO. 18 BM2 2.34 226.29 Determine the bearing of side CA PROBLEM NO. 14 What is the value of x? A)545 12 W B)557°45' W AJ 0.17 B30.07 C3054 DJ 0.43 C)552°34' W DJS 49°40' W PROBLEM NO. 15 What is the value of y A) 231.79 B) 230.67 C) 232.78 D) 233.21 PROBLEM NO. 19 Determine the length of side CA. A.) 65.3 m B) 103.8 m C) 93.4m DJ844m PROBLEM NO. 07 TP1 has an elevation of 115.15 m and the foresight taken at the point is 0.30 m. If the BS taken at BM is 1.42 m, what is the elevation of BM? A) 114.03 m PROBLEM NO. 20 Determine the area of the parcel. A.) 2,984.34 m² B.) 3,234.98 m² C.) 2,723.58 m² 8.) 115.21 m D.) 2,678.43 m²
SITUATION NO. 02 P14-P1S Given the following field notes for a differential leveling All units are in meters. SITUATION NO. 03: P18-P20 A triangular parcel ABC have the following technical description: STATION 115 HI PS ELEV SIDE BEARING LENGTH BMI v 236.46 235.21 A 0.98 235.99 1.45 AB N60°30' W 68.75m B 234.30 2.12 233.87 C 023 232.66 1.07 232.43 BC N80°30'E 125.90m D 045 y 132 231.34 CA 7 E 076 23023 2.32 F 021 228.63 1.81 228.42 PROBLEM NO. 18 BM2 2.34 226.29 Determine the bearing of side CA PROBLEM NO. 14 What is the value of x? A)545 12 W B)557°45' W AJ 0.17 B30.07 C3054 DJ 0.43 C)552°34' W DJS 49°40' W PROBLEM NO. 15 What is the value of y A) 231.79 B) 230.67 C) 232.78 D) 233.21 PROBLEM NO. 19 Determine the length of side CA. A.) 65.3 m B) 103.8 m C) 93.4m DJ844m PROBLEM NO. 07 TP1 has an elevation of 115.15 m and the foresight taken at the point is 0.30 m. If the BS taken at BM is 1.42 m, what is the elevation of BM? A) 114.03 m PROBLEM NO. 20 Determine the area of the parcel. A.) 2,984.34 m² B.) 3,234.98 m² C.) 2,723.58 m² 8.) 115.21 m D.) 2,678.43 m²
Mathematics For Machine Technology
8th Edition
ISBN:9781337798310
Author:Peterson, John.
Publisher:Peterson, John.
Chapter41: Algebraic Operations Of Addition, Subtraction, And Multiplication
Section: Chapter Questions
Problem 5A: Read the decimal-inch measurement on the vernier height gage in Figure 41-2.
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
Recommended textbooks for you
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Glencoe Algebra 1, Student Edition, 9780079039897…
Algebra
ISBN:
9780079039897
Author:
Carter
Publisher:
McGraw Hill
Algebra & Trigonometry with Analytic Geometry
Algebra
ISBN:
9781133382119
Author:
Swokowski
Publisher:
Cengage
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Glencoe Algebra 1, Student Edition, 9780079039897…
Algebra
ISBN:
9780079039897
Author:
Carter
Publisher:
McGraw Hill
Algebra & Trigonometry with Analytic Geometry
Algebra
ISBN:
9781133382119
Author:
Swokowski
Publisher:
Cengage