Question
In the P-V diagram
shown the work done by
the system is equal to:
p(N/m²)
L
4
3
2
8 9 10 11
12 13 14 15 16 17
3
v m
A) 20 J
B) 10 J
C) 30J
D) 2 J
Hint: W = p. AV
Transcribed Image Text:In the P-V diagram shown the work done by the system is equal to: p(N/m²) L 4 3 2 8 9 10 11 12 13 14 15 16 17 3 v m A) 20 J B) 10 J C) 30J D) 2 J Hint: W = p. AV
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images