Shown below are the tasks, times, and precedence requirements for the work required to assemble a copier machine. Production time per day = 480 minutes. Desired output per day = 40 units. TASK TASK TIME, mins IMMEDIATE PREDECESSOR/S 10 11 A в 4 B E 12 A 3 С, D G F H 11 E G, H ETt = 66 1. What's the cycle time for this production line? 2. What's the theoretical minimum number of workstations that should be set up? 3. List the paths for this problem. 4. Draw the precedence diagram for this problem. 5. How many workstations should be set up in this production line? 6. Which tasks should be performed in each workstation? 7. Draw the diagram of the production line.
Breakeven Analysis
Break Even Analysis is a term used in business, cost accounting and economics. It refers to a point where the total cost incurred becomes equal to the total revenue earned. Break Even Analysis determines the number of units to be sold to earn the revenue required to cover the total costs. Total cost is a sum total of fixed and variable costs.
Process analysis
The term process analysis can be defined as breakdown of production process into different phases that converts inputs into output. A series of routine activities are incorporated using organizational resources with a view to achieve operational excellence.
Please include calculations if necessary.
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 1 images