Roedel Electronics produces tablet computer accessories, including integrated keyboard tablet stands that connect a keyboard to a tablet device and hold the device at a preferred angle for easy viewing and typing. Roedel produces two different sizes of integrated keyboard tablet stands, small and large. Each size uses the same keyboard attachment, but the stand consists of two different pieces, a top flap and a vertical stand that differ by size. Thus, a completed integrated keyboard tablet stand consists of three subassemblies that are manufactured by Roedel: a keyboard, a top flap and a vertical stand. Roedel's sales forecast indicates that 7,000 small integrated keyboard tablet stands and 5,000 large integrated keyboard tablet stands will be needed to satisfy demand during the upcoming Christmas season. Because only 500 hours of in-house manufacturing time are available, Roedel is considering purchasing some, or all, of the subassemblies from outside suppliers. If Roedel manufactures a subassembly in-house, it incurs a fixed setup cost as well as a variable manufacturing cost. The following table shows the setup cost, the manufacturing time per subassembly, the manufacturing cost per subassembly, and the cost to purchase each of the subassemblies from an outside supplier:       Manufacturing   Subassembly Setup Cost ($) Time per Unit (min.) Cost per Unit ($) Purchase Cost per Unit ($) Keyboard 1,000 1.8 0.40 0.65 Small top flap 1,200 2.2 2.90 3.30 Large top flap 1,900 3.0 3.15 3.70 Small vertical stand 1,500 0.8 0.30 0.60 Large vertical stand 1,500 1.0 0.55 1.00   If required, round your answers to nearest whole number.   (a) Determine how many units of each subassembly Roedel should manufacture and how many units of each subassembly Roedel should purchase. If an amount is zero, enter “0”. Round your answers to the nearest whole number, if necessary. b. Suppose Roedel is considering purchasing new machinery to produce large top flaps. For the new machinery, the setup cost is $3,000; the manufacturing time is 2.5 minutes per unit , and the manufacturing cost is $2.60 per unit. Assuming that the new machinery is purchased, determine how many units of each subassembly Roedel should manufacture and how many units of each subassembly Roedel should purchase. If an amount is zero, enter “0”.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question

Roedel Electronics produces tablet computer accessories, including integrated keyboard tablet stands that connect a keyboard to a tablet device and hold the device at a preferred angle for easy viewing and typing. Roedel produces two different sizes of integrated keyboard tablet stands, small and large. Each size uses the same keyboard attachment, but the stand consists of two different pieces, a top flap and a vertical stand that differ by size. Thus, a completed integrated keyboard tablet stand consists of three subassemblies that are manufactured by Roedel: a keyboard, a top flap and a vertical stand.

Roedel's sales forecast indicates that 7,000 small integrated keyboard tablet stands and 5,000 large integrated keyboard tablet stands will be needed to satisfy demand during the upcoming Christmas season. Because only 500 hours of in-house manufacturing time are available, Roedel is considering purchasing some, or all, of the subassemblies from outside suppliers. If Roedel manufactures a subassembly in-house, it incurs a fixed setup cost as well as a variable manufacturing cost. The following table shows the setup cost, the manufacturing time per subassembly, the manufacturing cost per subassembly, and the cost to purchase each of the subassemblies from an outside supplier:

 

    Manufacturing  
Subassembly Setup Cost ($) Time per Unit (min.) Cost per Unit ($) Purchase Cost per Unit ($)
Keyboard 1,000 1.8 0.40 0.65
Small top flap 1,200 2.2 2.90 3.30
Large top flap 1,900 3.0 3.15 3.70
Small vertical stand 1,500 0.8 0.30 0.60
Large vertical stand 1,500 1.0 0.55 1.00

 

If required, round your answers to nearest whole number.

 

(a) Determine how many units of each subassembly Roedel should manufacture and how many units of each subassembly Roedel should purchase. If an amount is zero, enter “0”. Round your answers to the nearest whole number, if necessary.

b. Suppose Roedel is considering purchasing new machinery to produce large top flaps. For the new machinery, the setup cost is $3,000; the manufacturing time is 2.5 minutes per unit , and the manufacturing cost is $2.60 per unit. Assuming that the new machinery is purchased, determine how many units of each subassembly Roedel should manufacture and how many units of each subassembly Roedel should purchase. If an amount is zero, enter “0”.

•
8
ⒸHE
?
CENGAGE MINDTAP
Chapter 13 Assignment
(a) Determine how many units of each subassembly Roedel should manufacture and how many units of each subassembly Roedel should purchase. If an amount is zero, enter "0".
Round your answers to the nearest whole number, if necessary.
Quantity
Subassembly
Keyboard
Small Top Flap
Large Top Flap
Small Vertical Stand
Large Vertical Stand
55650
Subassembly
Keyboard
Small Top Flap
Large Top Flap
Production
Small Vertical Stand
30000
Large Vertical Stand
0
0
7000
5000
What is the total manufacturing and purchase cost associated with your recommendation?
Production
0
5000
X
✔
(b) Suppose Roedel is considering purchasing new machinery to produce large top flaps. For the new machinery, the setup cost is $3,000; the manufacturing time is 2.5 minutes per
unit, and the manufacturing cost is $2.60 per unit. Assuming that the new machinery is purchased, determine how many units of each subassembly Roedel should manufacture and
how many units of each subassembly Roedel should purchase. If an amount is zero, enter "0".
Quantity
0
✔
5000
✔
✔
✓
X
S
Purchase
✔
30000
✔
7000
5000
0
0
Purchase
12000
0
7000
Q Search this course
X
✔
What is the total manufacturing and purchase cost associated with your recommendation?
55750
Do you think the new machinery should be purchased? Explain.
(i) Assuming the new machinery can be used in future seasons, it would be beneficial for Roedel to purchase the new equipment.
(ii) The new machinery is too expensive for Roedel to purchase.
A-Z
Office
W
Ð
Transcribed Image Text:• 8 ⒸHE ? CENGAGE MINDTAP Chapter 13 Assignment (a) Determine how many units of each subassembly Roedel should manufacture and how many units of each subassembly Roedel should purchase. If an amount is zero, enter "0". Round your answers to the nearest whole number, if necessary. Quantity Subassembly Keyboard Small Top Flap Large Top Flap Small Vertical Stand Large Vertical Stand 55650 Subassembly Keyboard Small Top Flap Large Top Flap Production Small Vertical Stand 30000 Large Vertical Stand 0 0 7000 5000 What is the total manufacturing and purchase cost associated with your recommendation? Production 0 5000 X ✔ (b) Suppose Roedel is considering purchasing new machinery to produce large top flaps. For the new machinery, the setup cost is $3,000; the manufacturing time is 2.5 minutes per unit, and the manufacturing cost is $2.60 per unit. Assuming that the new machinery is purchased, determine how many units of each subassembly Roedel should manufacture and how many units of each subassembly Roedel should purchase. If an amount is zero, enter "0". Quantity 0 ✔ 5000 ✔ ✔ ✓ X S Purchase ✔ 30000 ✔ 7000 5000 0 0 Purchase 12000 0 7000 Q Search this course X ✔ What is the total manufacturing and purchase cost associated with your recommendation? 55750 Do you think the new machinery should be purchased? Explain. (i) Assuming the new machinery can be used in future seasons, it would be beneficial for Roedel to purchase the new equipment. (ii) The new machinery is too expensive for Roedel to purchase. A-Z Office W Ð
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 10 images

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.