Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) LOADING... for this problem. Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: Hour x R Hour x R Hour x R Hour x R 1 3.15" 0.65" 7 3.15" 0.58" 13 3.11" 0.85" 19 4.51" 1.66" 2 3.00 1.23 8 2.65 1.13 14 2.93 1.31 20 2.89 1.04 3 3.22 1.43 9 3.02 0.66 15 3.22 1.11 21 2.55 1.08 4 3.39 1.21 10 2.85 1.28 16 2.84 0.55 22 3.28 0.41 5 3.07 1.12 11 2.73 1.12 17 2.96 1.43 23 2.84 1.63 6 2.76 0.42 12 3.07 0.45 18 2.84 1.34 24 2.64 0.92 Based on the sampling done, the control limits for 3-sigma x chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Part 2 Upper Control Limit (UCLx) = enter your response here inches (round your response to three decimal places).
Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) LOADING... for this problem. Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: Hour x R Hour x R Hour x R Hour x R 1 3.15" 0.65" 7 3.15" 0.58" 13 3.11" 0.85" 19 4.51" 1.66" 2 3.00 1.23 8 2.65 1.13 14 2.93 1.31 20 2.89 1.04 3 3.22 1.43 9 3.02 0.66 15 3.22 1.11 21 2.55 1.08 4 3.39 1.21 10 2.85 1.28 16 2.84 0.55 22 3.28 0.41 5 3.07 1.12 11 2.73 1.12 17 2.96 1.43 23 2.84 1.63 6 2.76 0.42 12 3.07 0.45 18 2.84 1.34 24 2.64 0.92 Based on the sampling done, the control limits for 3-sigma x chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Part 2 Upper Control Limit (UCLx) = enter your response here inches (round your response to three decimal places).
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
100%
Refer to
Table S6.1 - Factors for Computing Control Chart Limits (3 sigma)
for this problem.LOADING...
Sampling
4
pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results:
Hour
|
x
|
R
|
Hour
|
x
|
R
|
Hour
|
x
|
R
|
Hour
|
x
|
R
|
1
|
3.15"
|
0.65"
|
7
|
3.15"
|
0.58"
|
13
|
3.11"
|
0.85"
|
19
|
4.51"
|
1.66"
|
2
|
3.00
|
1.23
|
8
|
2.65
|
1.13
|
14
|
2.93
|
1.31
|
20
|
2.89
|
1.04
|
3
|
3.22
|
1.43
|
9
|
3.02
|
0.66
|
15
|
3.22
|
1.11
|
21
|
2.55
|
1.08
|
4
|
3.39
|
1.21
|
10
|
2.85
|
1.28
|
16
|
2.84
|
0.55
|
22
|
3.28
|
0.41
|
5
|
3.07
|
1.12
|
11
|
2.73
|
1.12
|
17
|
2.96
|
1.43
|
23
|
2.84
|
1.63
|
6
|
2.76
|
0.42
|
12
|
3.07
|
0.45
|
18
|
2.84
|
1.34
|
24
|
2.64
|
0.92
|
Based on the sampling done,
the
control limits for 3-sigma
x
chart are (round all intermediate calculations to three decimal places before proceeding with further
calculations):
Part 2
Upper Control Limit
(UCLx)
=
enter your response here
inches (round your response to three decimal places).Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 4 images
Follow-up Questions
Read through expert solutions to related follow-up questions below.
Follow-up Question
Based on the
x-chart,
the wire cutting process has been
Solution
by Bartleby Expert
Follow-up Question
Based on the
.
x-chart,
the wire cutting process has been
OUT OF CONTROL
Part 5
The control limits for the
3-sigma
R-chart are (round all intermediate calculations to three decimal places before proceeding with further
calculations):
Part 6
Upper Control Limit
(UCLR)
=
enter your response here
inches (round your response to three decimal placesSolution
by Bartleby Expert
Follow-up Question
Lower Control Limit
(LCLx)
=
enter your response here
inches (round your response to three decimal places).
Solution
by Bartleby Expert
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.