QI:- Design a settling tank for a flow of 0.2 MGD if the overflow rate is not to exceed 600 gpd/n. Calculate dimensions if the tank is circular with a depth of 12 ft. Calculate dimensions if the tank is rectangular with a depth of 10 ft and a length to width ratio of 4 to 1

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
QI:- Design a settling tank for a flow of 0.2 MGD if the overflow rate is not to
exceed 600 gpd/n. Calculate dimensions if the tank is circular with a depth of 12
ft.
Calculate dimensions if the tank is rectangular with a depth of 10 fit and a length to
width ratio of 4 to 1
Q2:- The settling velocity of alum floc is approximately 0.0014 f/s in water at 10
C. Calculate the cquivalent overflow rate in gpd/f12. What is the minimum
detention time in hours to settle out alum floc in an ideal basin with a depth of 10
ft?
Q3:- Two rectangular clarifiers, cach 30 ft long, 15 ft wide, settle 0.40 MGD
following alum coagulation. The effluent channels have a total weir length of 60
ft. Calculate the detention time, horizontal velocity, rate of flow over the outlet
weir. Do these values meet the GLUMRB Standards for water works?
Q4:- Calculate the diameter and depth of a circular sedimentation basin for a
design flow of 3800 m3/d based on an overflow rate of 0.00024 m's and a
detention time of 3 hr
Transcribed Image Text:QI:- Design a settling tank for a flow of 0.2 MGD if the overflow rate is not to exceed 600 gpd/n. Calculate dimensions if the tank is circular with a depth of 12 ft. Calculate dimensions if the tank is rectangular with a depth of 10 fit and a length to width ratio of 4 to 1 Q2:- The settling velocity of alum floc is approximately 0.0014 f/s in water at 10 C. Calculate the cquivalent overflow rate in gpd/f12. What is the minimum detention time in hours to settle out alum floc in an ideal basin with a depth of 10 ft? Q3:- Two rectangular clarifiers, cach 30 ft long, 15 ft wide, settle 0.40 MGD following alum coagulation. The effluent channels have a total weir length of 60 ft. Calculate the detention time, horizontal velocity, rate of flow over the outlet weir. Do these values meet the GLUMRB Standards for water works? Q4:- Calculate the diameter and depth of a circular sedimentation basin for a design flow of 3800 m3/d based on an overflow rate of 0.00024 m's and a detention time of 3 hr
Expert Solution
steps

Step by step

Solved in 3 steps with 1 images

Blurred answer
Knowledge Booster
Storm sewers and detention
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning