Use (AON )METHOD
Q1: Determine the duration of project for the activities shown below, and find the
critical path by using ( A-0-N Disgrum)
3Activity
A
D
E
F
H.
KMNR
Đuration
6.
8
7.
11
3.
8.
9 4
4
(Weeks)
Followed C,D
D,F
E
J,H OKM I,K
R
by
00
MN
08.
3.
4
Transcribed Image Text:Q1: Determine the duration of project for the activities shown below, and find the critical path by using ( A-0-N Disgrum) 3Activity A D E F H. KMNR Đuration 6. 8 7. 11 3. 8. 9 4 4 (Weeks) Followed C,D D,F E J,H OKM I,K R by 00 MN 08. 3. 4
Expert Solution
steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Knowledge Booster
Braced cuts
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning