Q1 (a) Q1b) RL TBM A RL TBM B RL TBM A RL TBM B AAA.AAA BBB.BBB AAA.AAA BBB.BBB 163.965 162.655 163.465 162.155
Q1 (a) Q1b) RL TBM A RL TBM B RL TBM A RL TBM B AAA.AAA BBB.BBB AAA.AAA BBB.BBB 163.965 162.655 163.465 162.155
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
100%
![Q1 (a)
Q1(b)
RL TBM A
RL TBM B
RL TBM A
RL TBM B
AAA.AAA
BBB.BBB
ΑAAAAA
BBB.BBB
163.965
162.655
163.465
162.155](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F1fa0dc14-3e84-4604-99ad-3f936ffb156e%2Ff1942423-b600-48eb-96be-bc1132088b40%2F5pjlq8_processed.png&w=3840&q=75)
Transcribed Image Text:Q1 (a)
Q1(b)
RL TBM A
RL TBM B
RL TBM A
RL TBM B
AAA.AAA
BBB.BBB
ΑAAAAA
BBB.BBB
163.965
162.655
163.465
162.155
![Q1. Table Q1 shows the levelling data obtained from field observations between two
temporary benchmarks namely TBM 1 and TBM 2, respectively. Where, the total levelling
distance between TBM 1 and TBM 2 is 250 metres. As a junior site civil engineer at the
construction site, you have been assigned by a senior site civil engineer to finalise and
evaluate the levelling data to ensure the levelling work complies with the levelling
standard and procedures.
Table Q1
Intermediate
Backsight
Foresight
Remarks
Sight
1.592
ТВМ 1 RL3 AAА.AAA m
1.675
2.052
СР1
1.354
1.704
СР2
1.320
0.907
СР3
1.379
Point 1
1.384
Point 2
1.406
Point 3
0.940
1.315
СР4
0.832
1.507
СР5
-2.938
Soffit 1
-2.833
Soffit 2
-2.717
Soffit 3
1.546
ТВМ 2 RL-BВВ.BBB m
a) Finalise the levelling calculation using rise and fall method, performed arithmetic
check, accuracy check, levelling misclosure and final reduced level for all observed
points.
b) For verification purpose you are required to re-calculate the reduced level using height
of plain collimation (HPC) method, performed arithmetic check, accuracy check,
levelling misclosure and final reduced level for all observed points.](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F1fa0dc14-3e84-4604-99ad-3f936ffb156e%2Ff1942423-b600-48eb-96be-bc1132088b40%2F0wg0qud_processed.png&w=3840&q=75)
Transcribed Image Text:Q1. Table Q1 shows the levelling data obtained from field observations between two
temporary benchmarks namely TBM 1 and TBM 2, respectively. Where, the total levelling
distance between TBM 1 and TBM 2 is 250 metres. As a junior site civil engineer at the
construction site, you have been assigned by a senior site civil engineer to finalise and
evaluate the levelling data to ensure the levelling work complies with the levelling
standard and procedures.
Table Q1
Intermediate
Backsight
Foresight
Remarks
Sight
1.592
ТВМ 1 RL3 AAА.AAA m
1.675
2.052
СР1
1.354
1.704
СР2
1.320
0.907
СР3
1.379
Point 1
1.384
Point 2
1.406
Point 3
0.940
1.315
СР4
0.832
1.507
СР5
-2.938
Soffit 1
-2.833
Soffit 2
-2.717
Soffit 3
1.546
ТВМ 2 RL-BВВ.BBB m
a) Finalise the levelling calculation using rise and fall method, performed arithmetic
check, accuracy check, levelling misclosure and final reduced level for all observed
points.
b) For verification purpose you are required to re-calculate the reduced level using height
of plain collimation (HPC) method, performed arithmetic check, accuracy check,
levelling misclosure and final reduced level for all observed points.
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher: