Q: For the soil profile shown in figure. Determine the: a) Final consolidation settlement. b) Time (in month) required for 50% consolidation. c) Time (in month) required for the settlement to be (32) mm. d) Effective stress at the mid of the clay layer immediately after applying the load. e) Pore water pressure at the mid of the clay at the end of consolidation. ) Time (in month) required for full consolidation. g) value of maximum preconsolidation pressure (õp)at which the clay is considered as normally consolidated clay. Note: use yw = 10 kN/m³ Surcharge Aq,= 60 kPa El. 0 XXX Sand y=15 kN/m³ El. -3 m Sand y= 17 kN/ m³ El. -6 m Clay Y. = 19.5 kN/m³ e = 0.81 C, = 1.5 m/ yr O.C.R =1.6 C. = 0.15 C, = 0.02 El. -10 m Sand
Q: For the soil profile shown in figure. Determine the: a) Final consolidation settlement. b) Time (in month) required for 50% consolidation. c) Time (in month) required for the settlement to be (32) mm. d) Effective stress at the mid of the clay layer immediately after applying the load. e) Pore water pressure at the mid of the clay at the end of consolidation. ) Time (in month) required for full consolidation. g) value of maximum preconsolidation pressure (õp)at which the clay is considered as normally consolidated clay. Note: use yw = 10 kN/m³ Surcharge Aq,= 60 kPa El. 0 XXX Sand y=15 kN/m³ El. -3 m Sand y= 17 kN/ m³ El. -6 m Clay Y. = 19.5 kN/m³ e = 0.81 C, = 1.5 m/ yr O.C.R =1.6 C. = 0.15 C, = 0.02 El. -10 m Sand
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
100%
![Q: For the soil profile shown in figure. Determine the:
a) Final consolidation settlement.
b) Time (in month) required for 50% consolidation.
c) Time (in month) required for the settlement to be (32) mm.
d) Effective stress at the mid of the clay layer immediately after applying the load.
e) Pore water pressure at the mid of the clay at the end of consolidation.
f) Time (in month) required for full consolidation.
g) value of maximum preconsolidation pressure (õp)at which the clay is considered
as normally consolidated clay.
Note: use yw= 10 kN/m³
Surcharge Aq.= 60 kPa
El. 0
XXX
Sand y= 15 kN/m³
El. -3 m
Sand y= 17 kN/ m³
El. -6 m
Clay
Y. = 19.5 kN/m³
e = 0.81
C, = 1.5 m²/ yr
O.C.R =1.6
C. = 0.15
C, = 0.02
El. -10 m
Sand](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fc64fc629-3062-4754-b91e-d1db74edc8e1%2Fd104b1ce-7e13-4e09-b30a-e9769283c1ae%2Fcgnjkei_processed.jpeg&w=3840&q=75)
Transcribed Image Text:Q: For the soil profile shown in figure. Determine the:
a) Final consolidation settlement.
b) Time (in month) required for 50% consolidation.
c) Time (in month) required for the settlement to be (32) mm.
d) Effective stress at the mid of the clay layer immediately after applying the load.
e) Pore water pressure at the mid of the clay at the end of consolidation.
f) Time (in month) required for full consolidation.
g) value of maximum preconsolidation pressure (õp)at which the clay is considered
as normally consolidated clay.
Note: use yw= 10 kN/m³
Surcharge Aq.= 60 kPa
El. 0
XXX
Sand y= 15 kN/m³
El. -3 m
Sand y= 17 kN/ m³
El. -6 m
Clay
Y. = 19.5 kN/m³
e = 0.81
C, = 1.5 m²/ yr
O.C.R =1.6
C. = 0.15
C, = 0.02
El. -10 m
Sand
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps with 2 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning