profit function for a skateboard manufacturer is given by P X is equals to 30 x minus 3 x square - 250 find the exact profit from the 13th create board
Q: Is forecasting important in a planning of a project? why? why not?
A: Forecasting is a technique that takes into use of the historical data as the primary inputs and…
Q: 2. Describe Webvan's supply chain design in detail. Contrast Webvan's supply chain with that of a…
A: Webvan’s Supply chain: Webvan’s supply chain operations has begun on 1999 and now it…
Q: 1. Job is on a low cholesterol diet. During lunch at the LST canteen, he always chooses between two…
A: Given data is Pasta Tofu Required per month Proteins 8g 16g 180g Carbohydrates 55g 38g 930…
Q: 4. An industrial engineer has conducted a study aiming to minimize traffic flow stations (WSS)…
A:
Q: Develop Desicion tree
A: Size of the first station Good market Fair market Poor market Small 50000 20000 -10000 Medium…
Q: A manufacturer of television sets made four models – Sport, Standard, Traveler and Super. Each set…
A: Since you have submitted a question with multiple sub-parts, as per guidelines we have answered the…
Q: 1. Formulate a linear programming model for Angela and Zooey that will help them estimate the number…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: discuss the 8 principles of a Quality Management Systems, utilising practical examples for each…
A: Total Quality Management often called TQM can be stated as the management technique based on the…
Q: What is the most effective strategy to allocate resources to satisfy the demands of the customer?
A: Resource Allocation: Resource allocation is defined as allocating the manpower,…
Q: An office supplies retailer orders staplers (among other products) from the manufacturer. The annual…
A:
Q: The number of salespeople assigned to work during a shift is apportioned based on the average number…
A:
Q: Use simple exponential smoothing with a 0.6 to forecast chargers sales for February through May.…
A:
Q: What is the critical path and duration for this project?
A: A project schedule network diagram shows the sequence of the task that is performed to complete a…
Q: Calculate the reliability of the following system: 2 0.90 0.90 0.85 0.90 H 0.85 0.90 0.85 0.92
A: Reliability is the ability of the system to perform consistently and trustworthly throughout the…
Q: When hotel managers seek to buy new technology or enhance their current systems, what are they…
A: An enhancement or improvement can be stated as the user-interface characteristic that boosts up or…
Q: x1 + x2 ≤30 300 ≤5x1 + 6x2 x1 ≥0, x2 ≥0. From the given constraint above, provide the following a.…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: are required to set up a meeting to discuss the upcoming employee awards day function. Draw up…
A: 3.1. The major parameters include on conducting meetings or corporate functions are Productivity,…
Q: why might you come out better if you hire a brokerage firm to sell your home than sell it yourself?
A: ans 3= Property agents have a professional license to assist persons procure, sell, & rent…
Q: sify the source of conflict in the scenarios described. Employees at Best Enterprises do not know…
A: A complaint is for the most part characterized as a case by a worker that the person is unfavorably…
Q: Discuss five (5) challenges in setting goals
A: Organizations like Summerwood Hotel today are focused upon delivering the best commodities to their…
Q: f Executive Officer (CEO) of Virgin Active SA as his logistical support executive. The CEO has…
A: Depending on a wide range of factors, importing exercise equipment might be a challenging and…
Q: What is Warehouse Operation Management?
A: There are many challenges in warehouse operations management such as optimizing space utilization…
Q: The total time on the critical path is (type number only, no text) 4 Previous
A: Given data is
Q: Melur based uses and sells 15,000 units of a products per year with the price of RM60,000. Carrying…
A: Economic order quantity is described as a metric through which ideal or effective order size is…
Q: For an item with an average daily demand of 70 units with a standard deviation of 4 units, an…
A: Given data: Average daily demand (d) = 70 unitsThe standard deviation of demand (σ) =4 units…
Q: ation and enhances competitive advantage for the organisation. Using practical examples and…
A: Maintaining a private venture frequently implies the buck starts and stops with you. Yet, to draw in…
Q: By using and making reference to the case information attached - Explain any 4 reasons for global…
A: The given case is about the challenges faced by company H. The company is facing the issue of…
Q: CASE 1. Mossaic Tiles, Ltd. Gilbert Moss and Angela Pasaic spent several summers during their…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: Choose the best answer. The Production Planning Hierarchy: Box "C" A B CD Strategic Planning…
A: STRATEGIC PLANNING: Strategic planning in production can be defined as an overall planning which is…
Q: Explain Quality management and name at least two Pioneers involved in Quality management. Explain…
A: Quality management can be broadly defined as a philosophy in management that integrates all the…
Q: Electronics, Inc., in Nashv ces sn runs of custom ain ve scanners for the defense industry. You have…
A: In a manufacturing process, a kanban system is a form of inventory control that uses cards or tags…
Q: What is the difference between power and authority? Is it possible for a person to have formal…
A: Power: Power can be stated as the capability or prospects or potential of a person to impact or…
Q: What are the characteristics of an ERP?
A: An enterprise resource planning system is a software application that is used to automate the…
Q: Gilbert Moss and Angela eological sites in the Southwes ns. After college they made u aic Tiles,…
A: Number of batches to produce the tiles=100 Profit earned=$190 We have to find out 4) For artistic…
Q: What is the purpose of supply chain management systems
A: Supply chain management system:- Supply chain management systems are tools to help businesses and…
Q: a. Define the decision variables b. Write a linear programming model for this problem. c. Use the…
A: The transportation model is used to calculate the minimum cost of the route by selecting different…
Q: List the interrelated components of the performance management process and. explain how the poor…
A: Performance management:- The performance management process is designed to ensure that desired…
Q: How many productive resources (Person) are needed on throughout each task of the project?
A: A project schedule network diagram shows the sequence of the task that is performed to complete a…
Q: Short-term capacity planning deals with which of the following factors? Select one: O All of choices…
A: Capacity Planning: Capacity Planning is very important to every manufacturing…
Q: Ah Heng is in egg business. He has three poultry farms, A, B and C. The eggs are sent to three…
A: The question is related to Transportation Problem. The basis rule of transportation problem is…
Q: , objective tree and logical framework matrix, and (ii) logical framework matrix, action plan and…
A: Both problem tree and objective tree play important role in goal setting. Logical framework matrix…
Q: The manager of a Burger Doodle franchise wants to determine how many sausage biscuits and ham…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: 12.1-2* A young couple, Eve and Steven, want to divide their main household chores (marketing,…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: he dreamt of becoming a “businessman” and would go into stores in the city where he lived and…
A: Based on the above information four strategies are 1) Preparing and development 2) Valuing strategy…
Q: he hotel has experi nced the following occupancy rates for ne past the coliseum opened. Compute an…
A: Forecasting is a technique used to predict future outcomes on the basis of past data. In businesses…
Q: The government is auctioning off oil leases at two sites. At each site, 150,000 acres of land are to…
A: Find the Given details below: Given details: Cliff Ewing Blake Barnes Alexis Pickens Total…
Q: James Beerd bakes cheesecakes and Black Forest cakes. During any month, he can bake at most 65…
A:
Q: Months Month 1 Month 2 Month 3 Month 4 Month 5 Sales 20 25 32 35 38 Please use the weight 0.45 for…
A: Given data:
Q: Calculate the reorder point
A: Given Data Demand per week = 800 units Annual demand =800×52=41600 Ordering cost (S) = $72 Cost…
Q: CASE 1. Mossaic Tiles, Ltd. Gilbert Moss and Angela Pasaic spent several summers during their…
A: Given data is Tile type Molding hrs Baking hrs Glazing hours Clay derivative in pounds Larger…
profit function for a skateboard manufacturer is given by P X is equals to 30 x minus 3 x square - 250 find the exact profit from the 13th create board
Step by step
Solved in 2 steps with 1 images
- In Benefit/cost ratio analysis, if the salvage value is used to recover the first cost, it is being considered as: Select one: a. negative cost b. cost c. benefit d. disbenefit =================== Ali takes out a loan at 10 percent compounded annually for 7 years. At the end of this period, he pays off the loan at a value of $23,384.61. What amount did he borrow? Select one: a. $12,000.00 b. $15,000.00 c. $14,000.00 d. $13,000.00 ============= While considering the engineering economy concepts, the most important tense almost all exercises deal with is the annual worth. Select one: True False Ans allA. A company wants to produce a souvenir with a marketing life of six months. Uncertainty surrounds the likely sales volume as well as the fixed costs of the venture as shown below: Sales units Probability Contrn. /unit Probability Fixed cost K7 K5 100 000 0.3 80 000 0.6 60 000 0.1 1.0 0.5 0.5 1.0 Determine the expected value of the contribution K400 000 K450 000 K500 000 Probability 0.2 0.5 0.3 1.0Government officials must decide how to reduce the amount of Magentum being adulterated in the future. According to Becker, which of the following are options that could get the same expected cost of crime commission? 1 - Increase the probability of detection and conviction and combine that with a low sanction. 2 - Change the opportunity cost of the crime. 3 - Keep a low risk of probability of detection and conviction but impose a very high sanction. 1 and 3 1, 2, 3 1 and 2 2 and 3
- - Consider demand: x(p₁) = 400 — 2p1 At a market price of p₁ = $125 per unit: • Determine the social loss due to moral hazard when assuming: 1. Full insurance compared to uninsured 2. A co-payment of $50 compared to uninsured 3. A 75% coinsurance rate compared to uninsuredI draw 5 cards from a deck (replacing each cardimmediately after it is drawn). I receive $4 for each heartthat is drawn. Find the mean and variance of my total payoff.Your answer is partially correct. An independent contractor for a transportation company needs to determine whether she should upgrade the vehicle she currently owns or trade her vehicle in to lease a new vehicle. If she keeps her vehicle, she will need to invest in immediate upgrades that cost $5,200 and it will cost $1,300 per year to operate at the end of year that follows. She will keep the vehicle for 5 years; at the end of this period, the upgraded vehicle will have a salvage value of $3,800. Alternatively, she could trade in her vehicle to lease a new vehicle. She estimates that her current vehicle has a trade-in value of $9,800 and that there will be $4,100 due at lease signing. She further estimates that it will cost $2,900 per year to lease and operate the vehicle. The independent contractor's MARR is 11%. Compute the EUAC of both the upgrade and lease alternatives using the insider perspective. Click here to access the TVM Factor Table Calculator. 1943.56 EUAC(keep): $…
- A rural cooperative purchased a trencher at a cost of P230,500.00. It is estimated that the trencher will have a salvage value of P25,000.00 after digging 300,000 meters of irrigation canals. Determine the book value of the trencher after two years, if it was used to dig 50,000 meters on the first year and 75,000 meters on the second year. (Ans. P144,875.00)The calculation determines profitability or growth potential of an investment, expressed as a percentage, at the point where NPV equals zeroThe Gorman Manufacturing Company must decide whether to manufacture a component part at its Milan, Michigan, plant or purchase the component part from a supplier. The resulting profit is dependent upon the demand for the product. The following payoff table shows the projected profit (in thousands of dollars): Decision State of Nature Alternative Low Demand (S1) Medium Demand (S2) High Demand )S3) Manufacture, d(1) -20 40 100 Purchase, d(2) 10 45 70 The state-of-nature probabilities are P s1= 0.35, P s2= 0.35, and P s3= 0.30 Use expected value to recommend a decision.
- 3. The manager for a manufacturing company must recommend whether to construct a large plant, construct a small plant or do nothing. He estimates the long-run profits in $ as follows: State of Nature Alternative Good Average Poor Market($) Market ($) Market ($) Construct a 100,000 35,000 -60,000 large plant Construct a 75,000 25,000 -40,000 small plant Do nothing -5,000 0 0 Probability 25% 50% 25% Solve using: A. Expected Opportunity Loss B. Expected Value of Perfect InformationIf an economy can produce a maximum of 10 units of good X and the opportunity cost of 1X is always 6Y, then what is the maximum units of good Y the economy can produce? 0 60 O 600 050 500Barbara Flynn sells papers at a newspaper stand for $0.40. The papers cost her $0.30, giving her a $0.10 profit on each one she sells. From past experience Barbara knows that: a) 20% of the time she sells 150 papers. b) 20% of the time she sells 200 papers. c) 30% of the time she sells 250 papers. d) 30% of the time she sells 300 papers. Assuming that Barbara believes the cost of a lost sale to be $0.05 and any unsold papers cost her $0.30 and she orders 250 papers. Use the following random numbers: 14, 4, 13, 9, and 25 for simulating Barbara's profit. (Note: Assume the random number interval begins at 01 and ends at 00.) Based on the given probability distribution and the order size, for the given random number Barbara's sales and profit are (enter your responses for sales as integers and round all profit responses to two decimal places): Random Number Sales Profit 14 4 13 9 25