Problem 3: Tunnel Surveying Objective: To prepare survey computations from preliminary survey of a proposed tunnel. The preliminary survey consists of a detailed instrumental examination of the route to be selected as a result of the reconnaissance survey in order to estimate the cost of the proposed tunnel line. Problem: The following data are taken from the preliminary survey of a proposed tunnel. a) Determine the horizontal lengh, of tunnel. b) Determine the direction of tunnel. c) Determine the slope of tunnel
Problem 3: Tunnel Surveying Objective: To prepare survey computations from preliminary survey of a proposed tunnel. The preliminary survey consists of a detailed instrumental examination of the route to be selected as a result of the reconnaissance survey in order to estimate the cost of the proposed tunnel line. Problem: The following data are taken from the preliminary survey of a proposed tunnel. a) Determine the horizontal lengh, of tunnel. b) Determine the direction of tunnel. c) Determine the slope of tunnel
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter14: Highway Surveys And Location
Section: Chapter Questions
Problem 5P
Related questions
Question

Transcribed Image Text:Problem 3: Tunnel Surveying
Objective: To prepare survey computations from preliminary survey of a proposed tunnel.
The preliminary survey consists of a detailed instrumental examination of the route to be
selected as a result of the reconnaissance survey in order to estimate the cost of the
proposed tunnel line.
Problem:
The following data are taken from the preliminary survey of a proposed tunnel.
a) Determine the horizontal lengh of tunnel.
b) Determine the direction of tunnel.
c) Determine the slope of tunnel
Horizontal traverse
Bearing
N 40-10¹ E
N 50-20' E
S 70-45' E
N 55-25' E
Lines
AB
BC
CD
DE
Distance
210.55
245.70m
355.12m
505.23m
22

Transcribed Image Text:Points
BM
A
TP1
TP2
TP3
E
Vertical Traverse (Differential Leveling)
НІ
Foresight, FS
2.50
2.90
3.15
2.10
3.25
Back sight, BS
1.80
2.24
1.75
2.20
1.85
Elevation
330.50m
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 5 steps with 1 images

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you

Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning

Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning

Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning

Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning

Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,

Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning

Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,