Problem 3: Tunnel Surveying Objective: To prepare survey computations from preliminary survey of a proposed tunnel. The preliminary survey consists of a detailed instrumental examination of the route to be selected as a result of the reconnaissance survey in order to estimate the cost of the proposed tunnel line. Problem: The following data are taken from the preliminary survey of a proposed tunnel. a) Determine the horizontal lengh, of tunnel. b) Determine the direction of tunnel. c) Determine the slope of tunnel

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter14: Highway Surveys And Location
Section: Chapter Questions
Problem 5P
icon
Related questions
Question
Problem 3: Tunnel Surveying
Objective: To prepare survey computations from preliminary survey of a proposed tunnel.
The preliminary survey consists of a detailed instrumental examination of the route to be
selected as a result of the reconnaissance survey in order to estimate the cost of the
proposed tunnel line.
Problem:
The following data are taken from the preliminary survey of a proposed tunnel.
a) Determine the horizontal lengh of tunnel.
b) Determine the direction of tunnel.
c) Determine the slope of tunnel
Horizontal traverse
Bearing
N 40-10¹ E
N 50-20' E
S 70-45' E
N 55-25' E
Lines
AB
BC
CD
DE
Distance
210.55
245.70m
355.12m
505.23m
22
Transcribed Image Text:Problem 3: Tunnel Surveying Objective: To prepare survey computations from preliminary survey of a proposed tunnel. The preliminary survey consists of a detailed instrumental examination of the route to be selected as a result of the reconnaissance survey in order to estimate the cost of the proposed tunnel line. Problem: The following data are taken from the preliminary survey of a proposed tunnel. a) Determine the horizontal lengh of tunnel. b) Determine the direction of tunnel. c) Determine the slope of tunnel Horizontal traverse Bearing N 40-10¹ E N 50-20' E S 70-45' E N 55-25' E Lines AB BC CD DE Distance 210.55 245.70m 355.12m 505.23m 22
Points
BM
A
TP1
TP2
TP3
E
Vertical Traverse (Differential Leveling)
НІ
Foresight, FS
2.50
2.90
3.15
2.10
3.25
Back sight, BS
1.80
2.24
1.75
2.20
1.85
Elevation
330.50m
Transcribed Image Text:Points BM A TP1 TP2 TP3 E Vertical Traverse (Differential Leveling) НІ Foresight, FS 2.50 2.90 3.15 2.10 3.25 Back sight, BS 1.80 2.24 1.75 2.20 1.85 Elevation 330.50m
Expert Solution
steps

Step by step

Solved in 5 steps with 1 images

Blurred answer
Knowledge Booster
Area computations
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning