Problem 3: Tunnel Surveying Objective: To prepare survey computations from preliminary survey of a proposed tunnel. The preliminary survey consists of a detailed instrumental examination of the route to be selected as a result of the reconnaissance survey in order to estimate the cost of the proposed tunnel line. Problem: The following data are taken from the preliminary survey of a proposed tunnel. a) Determine the horizontal lengh, of tunnel. b) Determine the direction of tunnel. c) Determine the slope of tunnel
Problem 3: Tunnel Surveying Objective: To prepare survey computations from preliminary survey of a proposed tunnel. The preliminary survey consists of a detailed instrumental examination of the route to be selected as a result of the reconnaissance survey in order to estimate the cost of the proposed tunnel line. Problem: The following data are taken from the preliminary survey of a proposed tunnel. a) Determine the horizontal lengh, of tunnel. b) Determine the direction of tunnel. c) Determine the slope of tunnel
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter14: Highway Surveys And Location
Section: Chapter Questions
Problem 5P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 5 steps with 1 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning