Question
Q3) You are in charge of drilling operations in a sedimentary basin. The figure bellow
gives the setting. Prior to drilling you have performed a numerical analysis. The table
below states the necessary information at the bottom of the shale layer and at the top
of the sandstone layer. Assume hydrostatic pore pressure throughout the reservoir.
Stress results from your numerical models at 2250m:
To [MPa]
Rock layer Sy [MPa] S [MPa] S, [MPa] [deg] So [MPa]
Shale
Sandstone 55.2
55.2
65
40
30
20
10
0.25
30
25
30
10
5
0.25
planned wellpath
Shale thickness- 2250m
Sandstone: thidkness 250m
A. Your drilling crew on the rig wants to drill with a setting P-Po through the
shale. Will you approve this and give permission? Prove your decision by
calculating the necessary stresses and show a Mohr Circle construction so that
the driller can understand your reason. If unsafe, which borehole failure
mechanism do we expect? ;
B. Should they increase, decrease P, or stay with P=Po? Why?
C. Determine the save mud weight window to drill through the Sandstone
formation.
Transcribed Image Text:Q3) You are in charge of drilling operations in a sedimentary basin. The figure bellow gives the setting. Prior to drilling you have performed a numerical analysis. The table below states the necessary information at the bottom of the shale layer and at the top of the sandstone layer. Assume hydrostatic pore pressure throughout the reservoir. Stress results from your numerical models at 2250m: To [MPa] Rock layer Sy [MPa] S [MPa] S, [MPa] [deg] So [MPa] Shale Sandstone 55.2 55.2 65 40 30 20 10 0.25 30 25 30 10 5 0.25 planned wellpath Shale thickness- 2250m Sandstone: thidkness 250m A. Your drilling crew on the rig wants to drill with a setting P-Po through the shale. Will you approve this and give permission? Prove your decision by calculating the necessary stresses and show a Mohr Circle construction so that the driller can understand your reason. If unsafe, which borehole failure mechanism do we expect? ; B. Should they increase, decrease P, or stay with P=Po? Why? C. Determine the save mud weight window to drill through the Sandstone formation.
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
System of units
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning