myLU Problem XM Question X Dashbo XPHYS23: X Physics X What Is X Physics x + https://ezto.mheducation.com/ext/map/index.html?_con-con&external_browser=0&launchUrl... A myLU Bing McAfee LiveSafe - B... canvas.liberty.edu ensitivity Analysis & Decision Ma... Saved ព Help Save & Exit Subm Check my work An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $12000 per year. In addition, an extra $16.50 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 65.0 days per year? The MARR is 12.00% per year. (Round the final answers to three decimal places.) (Include a minus sign if necessary.) The annual worth of plan 1 lease optimistic is $ The annual worth of plan 1 most likely is $ The annual worth of plan 1 pessimistic is $ The annual worth of plan 2 rental is $ Plan 1 lease optimistic is better Plan 1 most likely is better than rental of plan 2. than rental of plan 2. intin in Li Q Search W R than rental of al < Prev 4 of 10 Next >
myLU Problem XM Question X Dashbo XPHYS23: X Physics X What Is X Physics x + https://ezto.mheducation.com/ext/map/index.html?_con-con&external_browser=0&launchUrl... A myLU Bing McAfee LiveSafe - B... canvas.liberty.edu ensitivity Analysis & Decision Ma... Saved ព Help Save & Exit Subm Check my work An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $12000 per year. In addition, an extra $16.50 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 65.0 days per year? The MARR is 12.00% per year. (Round the final answers to three decimal places.) (Include a minus sign if necessary.) The annual worth of plan 1 lease optimistic is $ The annual worth of plan 1 most likely is $ The annual worth of plan 1 pessimistic is $ The annual worth of plan 2 rental is $ Plan 1 lease optimistic is better Plan 1 most likely is better than rental of plan 2. than rental of plan 2. intin in Li Q Search W R than rental of al < Prev 4 of 10 Next >
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning