Mr. Hoi is the manager of a shop that assembles power tools. You have just received an order for 50 chain saws, which are to be shipped at the start of week 8. Pertinent information on the saws is (given in the picture) Suppose now that capacity to produce part E is limited to a maximum of 100 units per period. Revise the planned-order releases for periods 1 through 4 so that the maximum is not exceeded in any period, keeping in mind an objective of minimizing carrying costs. The quantities need not be equal in every period. Note that the gross requirements for E will remain the same. However, quantities in some of the other rows will change. Determine the new cell values for those rows.
Mr. Hoi is the manager of a shop that assembles power tools. You have just received an order for 50 chain saws, which are to be shipped at the start of week 8. Pertinent information on the saws is (given in the picture)
Suppose now that capacity to produce part E is limited to a maximum of 100 units per period. Revise the planned-order releases for periods 1 through 4 so that the maximum is not exceeded in any period, keeping in mind an objective of minimizing carrying costs. The quantities need not be equal in every period. Note that the gross requirements for E will remain the same. However, quantities in some of the other rows will change. Determine the new cell values for those rows.
![Item
Saw
A
B
C
D
E
F
A(2)
Prepare product structure tree:
Saw
E(3)
D D(2)
Prepare assembly time chart:
D
E
D
D
E
3
Lead Time
(weeks)
B
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Planned order receipts
Planned order releases
B
C
Start of week 2
Prepare master schedule:
Week 12345678
Quantity
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Planned order receipts
Planned order releases
2
1
2
2
1
1
2
Week
F(3) E(2)
15
10
5
Beginning
inventory
Beginning
inventory
65
50
10
Develop a material requirement planning for saw:
1
Beginning 1
inventory
10
1
65
C(4)
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Planned order receipts
Planned order releases
35
Develop a material requirement planning for Component A (2):
Saw
15
10
The
Start of week 8
2
On Hand
D(2)
10
65
2
15
10
5
65
20
10
30
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Planned order receipts
Planned order releases
Develop a material requirement planning for Component C (4):
10
15
3
10
3
65
3
15
3
10
4
140
10
4
4
65
75
15
5
4
150
10
140
140
180
10
60
5
65
Develop a material requirement planning for Component E (3) and E (3):
Beginning 1
inventory
Components
A(2), B(1), C(4)
E(3), D(1)
D(2), F(3)
E(2), D(2)
5
180
0
180
180
5
15
6
70
10
60
60
6
140
65
75
75
6
6
0
15
7
0
7
0
7
0
7
15
8
0
8
0
0
8
0
8
50
15
35
35](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fc22c4fa8-bc7a-472a-b20f-38a0cb7eb4cb%2Fa6206c66-e848-4925-8f3e-49d837f2a454%2Fpx27x9_processed.png&w=3840&q=75)
![](/static/compass_v2/shared-icons/check-mark.png)
Trending now
This is a popular solution!
Step by step
Solved in 5 steps with 10 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
![Business in Action](https://www.bartleby.com/isbn_cover_images/9780135198100/9780135198100_smallCoverImage.gif)
![Purchasing and Supply Chain Management](https://www.bartleby.com/isbn_cover_images/9781285869681/9781285869681_smallCoverImage.gif)
![Production and Operations Analysis, Seventh Editi…](https://www.bartleby.com/isbn_cover_images/9781478623069/9781478623069_smallCoverImage.gif)