Mobile Oil company has recently acquired oil rights to a new potential source of natural oil in Alaska. The current market value of these rights is $90,000. If there is natural oil at the site, it is estimated to be worth $800,000; however, the company would have to pay $100,000 in drilling costs to extract the oil. The company believes there is a 0.25 probability that the proposed drilling site actually would hit the natu- ral oil reserve. Alternatively, the company can pay $30,000 to first carry out a seismic survey at the proposed drilling site. The probability of a favorable seismic survey when oil is present at the drilling site is 0.6. The probability of an unfavorable seis- mic survey when no oil is present is 0.80. Need assistance on how to build A decision tree for this problem Build a decision tree
Contingency Table
A contingency table can be defined as the visual representation of the relationship between two or more categorical variables that can be evaluated and registered. It is a categorical version of the scatterplot, which is used to investigate the linear relationship between two variables. A contingency table is indeed a type of frequency distribution table that displays two variables at the same time.
Binomial Distribution
Binomial is an algebraic expression of the sum or the difference of two terms. Before knowing about binomial distribution, we must know about the binomial theorem.
Mobile Oil company has recently acquired oil rights to a new potential source of natural oil in Alaska. The current market value of these rights is $90,000. If there is natural oil at the site, it is estimated to be worth $800,000; however, the company would have to pay $100,000 in drilling costs to extract the oil. The company believes there is a 0.25
Need assistance on how to build A decision tree for this problem
Build a decision tree
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images