Johnson Electronics manufactures a power supply used in a variety of electronic products, including printers, modems and routers. The demand for the part is 7,600 units per week. The production of the power supply requires six different manufacturing operations, each in sequence and each having the following process time the net available time to work is 48 hours per week, using two shifts Operation Process time (seconds) Operations 1 18 Operations 2 15 Operations 3 23 Operations 4 17 Operations 5 26 Operations 6 21 Required: What is the Takt time, in seconds, for this product? Round answer to nearest whole number
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
Johnson Electronics manufactures a power supply used in a variety of electronic products, including printers, modems and routers. The demand for the part is 7,600 units per week. The production of the power supply requires six different manufacturing operations, each in sequence and each having the following process time the net available time to work is 48 hours per week, using two shifts
Operation |
Process time (seconds) |
Operations 1 |
18 |
Operations 2 |
15 |
Operations 3 |
23 |
Operations 4 |
17 |
Operations 5 |
26 |
Operations 6 |
21 |
Required: What is the Takt time, in seconds, for this product? Round answer to nearest whole number
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images