If the square footing has an 800mm edge with a 300mm thickness, and that the 200mm x 200mm column has a 1.1m height from the top of the footing up to the finished ground line are both constructed, how much gravel (in m3) should be exactly used for a class B concrete mixture for the footing and the column (up to the finished ground line level).

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%

ASAP PLS I GIVE UPVOTE

If the square footing has an 800mm edge with a 300mm thickness, and that the 200mm x 200mm column has a 1.1m height from the top of the footing up to the finished ground line are both constructed, how much gravel (in m3) should be exactly used for a class B concrete mixture for the footing and the column (up to the finished ground line level).

CLASS AA (1: 1-1/2:3) Concrete mix
C/V x 10.46
CV x 0.42
C/V x 0.84
= No. of Bags Cement
= No. of Cubic meters Sand
= No. of Cubic meters Gravel
CLASS A (1:2:4) Concrete mix
C/Vx 7.85 = No. of Bags Cement
CV x
C/Vx 0.42 = No. of Cubic meters-Sand
C/V x 0.84
= No. of Cubic meters Gravel
CLASS B (1:2-1/2: 5) Concrete mix
C/V x 6.49 = No. of Bags Cement
C/V x 0.44
C/V x 0.87
= No. of Cubic meters Sand
= No. of Cubic meters Gravel
CLASS C (1:3:6) Concrete mix
C/V x 5.49
CV x 0.44 = No. of Cubic meters Sand
= No. of Bags Cement
C/V x 0.89
= No. of Cubic meters Gravel
CLASS D (1: 3- 1/2:7) Concrete mix
CV x 4.82
C/V x 0.45
CV x 0.91
= No. of Bags Cement
= No. of Cubic meters Sand
= No. of Cubic meters Gravel
Transcribed Image Text:CLASS AA (1: 1-1/2:3) Concrete mix C/V x 10.46 CV x 0.42 C/V x 0.84 = No. of Bags Cement = No. of Cubic meters Sand = No. of Cubic meters Gravel CLASS A (1:2:4) Concrete mix C/Vx 7.85 = No. of Bags Cement CV x C/Vx 0.42 = No. of Cubic meters-Sand C/V x 0.84 = No. of Cubic meters Gravel CLASS B (1:2-1/2: 5) Concrete mix C/V x 6.49 = No. of Bags Cement C/V x 0.44 C/V x 0.87 = No. of Cubic meters Sand = No. of Cubic meters Gravel CLASS C (1:3:6) Concrete mix C/V x 5.49 CV x 0.44 = No. of Cubic meters Sand = No. of Bags Cement C/V x 0.89 = No. of Cubic meters Gravel CLASS D (1: 3- 1/2:7) Concrete mix CV x 4.82 C/V x 0.45 CV x 0.91 = No. of Bags Cement = No. of Cubic meters Sand = No. of Cubic meters Gravel
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Measuring concrete work
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning