If the production of a dozer is 111 lcy/hr is moving a soil with swell factor of 0.89 and has a total owning and operating cost of $47.35 per hour, what is the direct production cost in bey/hr? a) $0.43 per bcy b) $0.44 per bcy c) $0.48 per bcy d) none of the above

Principles of Foundation Engineering (MindTap Course List)
9th Edition
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter5: Soil Improvement And Ground Modification
Section: Chapter Questions
Problem 5.13P
icon
Related questions
Question
If the production of a dozer is 111 lcy/hr is moving a soil with swell factor of 0.89 and has a total
owning and operating cost of $47.35 per hour, what is the direct production cost in bey/hr?
a) $0.43 per bcy
b) $0.44 per bcy
c) $0.48 per bcy
d) none of the above
Transcribed Image Text:If the production of a dozer is 111 lcy/hr is moving a soil with swell factor of 0.89 and has a total owning and operating cost of $47.35 per hour, what is the direct production cost in bey/hr? a) $0.43 per bcy b) $0.44 per bcy c) $0.48 per bcy d) none of the above
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Introduction to Material Study
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning