how much is total cost of goods manufactured? A company uses job order costing, At the beginning of February, two jobs were in process: Job 769 Job 772 Materials P4.000 P1.400 Direct labor 7000 600 Appled Factory Overhead 3,000 900 There was no inventory of finished goods on February 1 During the month, Jobs 773, 774, 776, 778 and 779 were started Matera's requisitions for February totaled P26.000, direct mobor cost, P20,000 and actual factory overhead. P32.000- Factory overhead is applied at a rate of 150% of direct labor cost. The only job still in process at the end of February is 779, with a materials cost of P2,800 and direct labor cost of P1 800 Job 776, the onlY finished rob on hand at tee end of the month, has a total cost of P4,000, how much is total cost of goods manufactured?
how much is total cost of goods manufactured? A company uses
Job 769 Job 772
Materials P4.000 P1.400
Direct labor 7000 600
Appled Factory
There was no inventory of finished goods on February 1 During the month, Jobs 773, 774, 776, 778 and 779 were started Matera's requisitions for February totaled P26.000, direct mobor cost, P20,000 and actual factory overhead. P32.000- Factory overhead is applied at a rate of 150% of direct labor cost. The only job still in process at the end of February is 779, with a materials cost of P2,800 and direct labor cost of P1 800 Job 776, the onlY finished rob on hand at tee end of the month, has a total cost of P4,000, how much is total cost of goods manufactured?

Step by step
Solved in 2 steps with 1 images