How much is the minimum cost for this assignment problem? 87 89 O 92 O 94

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question

Given:

Use the Hungarian Method to find the best assignment.

In a shop, four jobs may be performed on any of the four machines. The number of hours needed for each job on each machine are presented in the table below. The shop manager wants to assign jobs so that total time is minimized. Use the assignment method to find the best solution.

    COMPONENT      
    W X Y Z
  A 21 20 39 36
MACHINE B 25 22 24 25
  C 36 22 36 26
  D 34 21 25 39

QUESTIONS 1 &2 : ( PICTURES ATTACHED BELOW)

 

How much is the minimum cost for this assignment problem?
87
89
O 92
O 94
Transcribed Image Text:How much is the minimum cost for this assignment problem? 87 89 O 92 O 94
Which of the following gives the minimum cost assignment for this problem?
Machine A manufactures Component W;
Machine B manufactures Component Y;
Machine C manufactures Component Z;
Machine D manufactures Component X.
O Machine A manufactures Component Y;
Machine B manufactures Component X;
Machine C manufactures Component W;
Machine D manufactures Component Z.
O Machine A manufactures Component Z;
Machine B manufactures Component Y;
Machine C manufactures Component W;
Machine D manufactures Component X.
O Machine A manufactures Component Z;
Machine B manufactures Component W;
Machine C manufactures Component X;
Machine D manufactures Component Y.
Transcribed Image Text:Which of the following gives the minimum cost assignment for this problem? Machine A manufactures Component W; Machine B manufactures Component Y; Machine C manufactures Component Z; Machine D manufactures Component X. O Machine A manufactures Component Y; Machine B manufactures Component X; Machine C manufactures Component W; Machine D manufactures Component Z. O Machine A manufactures Component Z; Machine B manufactures Component Y; Machine C manufactures Component W; Machine D manufactures Component X. O Machine A manufactures Component Z; Machine B manufactures Component W; Machine C manufactures Component X; Machine D manufactures Component Y.
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,