Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor-hours. At the beginning of the year, it estimated that 27,000 direct labor-hours would be required for the period’s estimated level of production. The company also estimated $512,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $4.00 per direct labor-hour. Harris’s actual manufacturing overhead cost for the year was $675,481 and its actual total direct labor was 27,500 hours. Required: Compute the company’s plantwide predetermined overhead rate for the year. (Round your answer to 2 decimal places.)
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
Harris Fabrics computes its plantwide predetermined
Required:
Compute the company’s plantwide predetermined overhead rate for the year. (Round your answer to 2 decimal places.)
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 2 images