Green Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/25 of a day and 1/60 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $300 and $220, respectively, per vehicle sold. The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value. Part 2 The optimum solution is: Number of trucks to be produced per day = ? enter your response here
Green Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/25 of a day and 1/60 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $300 and $220, respectively, per vehicle sold. The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value. Part 2 The optimum solution is: Number of trucks to be produced per day = ? enter your response here
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
Green Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/25 of a day and 1/60 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45 of a day to assemble either type of vehicle in the assembly shop.
A T1 truck and a C1 car yield profits of $300 and $220, respectively, per vehicle sold.
The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value.
Part 2
The optimum solution is:
Number of trucks to be produced per day = ?
enter your response here
Expert Solution
Step 1 - Introduction
Given data is
Profit from truck = $300
Profit from car = $220
Painting time for truck = 0.04 day
Painting time for car = 0.017 day
Assembly time for car and truck = 0.022 day
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 3 images
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.