Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 5,500 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown. Component Manufacturing Cost Purchase Cost $37.00 $10.50 $5.50 Frame Min Support Strap Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows. Department Cutting Milling Shaping 3.1 Component Frame Support Strap 3.5 Cutting constraint 21000 Milling constraint 25200 Shaping constraint 40800 Frame constraint 5500 1.3 Capacity (hours) 350 Support constraint 11000 Strap constraint 5500 0.8 x x x X (a) Formulate and solve a linear programming model for this make-or-buy application. (Let FM number of frames manufactured, FP= number of frames purchased, SM number of supports manufactured, SP number of supports purchased, TM number of straps manufactured, and TP number of straps purchased. Express time in minutes per unit.) x 2.2 x 1.7 $50.00 420 $14.00 $6.50 2.6 1.7 680 FM, FP, SM, SP, TM, TP 20 How many of each component should be manufactured and how many should be purchased? (Round your answers to the nearest whole number.) (FM, FP, SM, SP, TM, TP)-(0 x

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's
production schedule calls for 5,500 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and
purchase costs per unit are shown.
Component
Frame
Support
Min
Strap
Component
Manufacturing Cost
Frame
Cutting constraint 21000
Milling constraint 25200
Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows.
Shaping constraint 40800
Frame constraint 5500
Support constraint 11000
$37.00
Strap constraint 5500
$10.50
$5.50
(FM, FP, SM, SP, TM, TP) =
Cutting
3.5
Support
Strap
Capacity (hours)
(a) Formulate and solve a linear programming model for this make-or-buy application. (Let FM = number of frames manufactured, FP = number of frames purchased, SM = number of supports manufactured, SP = number of supports purchased, TM = number of straps
manufactured, and TP = number of straps purchased. Express time in minutes per unit.)
1.3
0.8
350
-(0
X
Department
Milling
X
X
X
X
X
2.2
Purchase Cost
1.7
420
$50.00
$14.00
$6.50
X
Shaping
3.1
2.6
FM, FP, SM, SP, TM, TP ≥ 0
How many of each component should be manufactured and how many should be purchased? (Round your answers to the nearest whole number.)
1.7
680
Transcribed Image Text:Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 5,500 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown. Component Frame Support Min Strap Component Manufacturing Cost Frame Cutting constraint 21000 Milling constraint 25200 Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows. Shaping constraint 40800 Frame constraint 5500 Support constraint 11000 $37.00 Strap constraint 5500 $10.50 $5.50 (FM, FP, SM, SP, TM, TP) = Cutting 3.5 Support Strap Capacity (hours) (a) Formulate and solve a linear programming model for this make-or-buy application. (Let FM = number of frames manufactured, FP = number of frames purchased, SM = number of supports manufactured, SP = number of supports purchased, TM = number of straps manufactured, and TP = number of straps purchased. Express time in minutes per unit.) 1.3 0.8 350 -(0 X Department Milling X X X X X 2.2 Purchase Cost 1.7 420 $50.00 $14.00 $6.50 X Shaping 3.1 2.6 FM, FP, SM, SP, TM, TP ≥ 0 How many of each component should be manufactured and how many should be purchased? (Round your answers to the nearest whole number.) 1.7 680
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.