Four resistors are connected to a battery, as shown below. The battery voltage is V, and the resistor values are R₁ = R, R₂ = 3R, R₂ = 4R, and R₁ = 2R. R₁ (a) (b) (c) V www 2 R₂ wwwwwwwww R3 R4 Show clearly that the equivalent resistance of the system is 3R. Find the current through, and the potential difference across, each resistor. Express each current in terms of V and R, and each potential difference in terms of V. Please display your results in a table for ease of reading. Of the four resistors in the circuit, which one dissipates the least power? (Hint: Refer to your results in the table above. One resistor has the lowest current and the smallest potential difference.)
Protection System
A system that protects electrical systems from faults by isolating the problematic part from the remainder of the system, preventing power from being cut from healthy elements, improving system dependability and efficiency is the protection system. Protection devices are the equipment that are utilized to implement the protection system.
Predictive Maintenance System
Predictive maintenance technologies are designed to assist in determining the state of in-service equipment so that maintenance can be scheduled. Predictive maintenance is the application of information; proactive maintenance approaches examine the condition of equipment and anticipate when it should maintain. The purpose of predictive maintenance is to forecast when equipment will fail (depending on a variety of parameters), then prevent the failure through routine and corrective maintenance.Condition monitoring is the continual monitoring of machines during process conditions to maintain optimal machine use, which is necessary for predictive maintenance. There are three types of condition monitoring: online, periodic, and remote. Finally, remote condition monitoring allows the equipment observed from a small place and data supplied for analysis.
Preventive Maintenance System
To maintain the equipment and materials on a regular basis in order to maintain those running conditions and reduce unnecessary shutdowns due to unexpected equipment failure is called Preventive Maintenance (PM).
Given data,
Resistance is R,
The potential difference is V,
Step by step
Solved in 5 steps