Example 9 (Homework) The following set of readings was taken along stations of a proposed oil pipeline: 1.5, 1.52, 1.8, 1.9, 2.5, 3.02, 2.09, 2.47, 4.03, 2.55, 2.11, 3.22, and 3.1. The sixth reading was taken at a benchmark of 14 m next to fifth station and the instrument was shifted after third station and eight reading. The distance between each two stations (from 1 to 5) is 10o m; from 5 to 9 is 50 m and distance at station 10 is o+620 km. Oil pipeline has to be constructed with the same elevation at station (o+620) and with no slope. Calculate cut and fill depths and draw the pipeline profile assuming suitable vertical and horizontal scales.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Example 9 (Homework)
The following set of readings was taken aleong stations of a
proposed oil pipeline: 1.5, 1.52, 1.8, 1.9, 2.5, 3.02, 2.09, 2.47, 4.03,
2.55, 2.11, 3.22, and 3.1. The sixth reading was taken at a
benchmark of 14 m next to fifth station and the instrument was
shifted after third station and eight reading. The distance
between each two stations (from i to 5) is 100 m; from 5 to 9 is 50
m and distance at station 10 is o+620 km. Oil pipeline has to be
constructed with the same elevation at station (0+620) and with
no slope. Calculate cut and fill depths and draw the pipeline
profile assuming suitable vertical and horizontal scales.
Transcribed Image Text:Example 9 (Homework) The following set of readings was taken aleong stations of a proposed oil pipeline: 1.5, 1.52, 1.8, 1.9, 2.5, 3.02, 2.09, 2.47, 4.03, 2.55, 2.11, 3.22, and 3.1. The sixth reading was taken at a benchmark of 14 m next to fifth station and the instrument was shifted after third station and eight reading. The distance between each two stations (from i to 5) is 100 m; from 5 to 9 is 50 m and distance at station 10 is o+620 km. Oil pipeline has to be constructed with the same elevation at station (0+620) and with no slope. Calculate cut and fill depths and draw the pipeline profile assuming suitable vertical and horizontal scales.
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Storm sewers and detention
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning